China’s second home-made LNG tanker leaves dry dock

Shanghai. June 14. INTERFAX-CHINA-China’s second domestically-constructed LNG tanker left dry dock on Monday, according to the builder, the Hudong-Zhonghua Shipbuilding Group.
The 147,210 cu m tanker that has total LNG storage capacity of 65,000 tons, cost as much as USD 160 mln to build. It is expected to be completely built by the beginning of 2008.