Search results for: Aoka Mizu

277 results

A list of search results

  • 27 March 2020
    Infrastructure, Regulation & policy, Safety, Vessels

    Hurricane Energy has confirmed that a crew member on the Aoka Mizu FPSO at the Lancaster field has been evacuated to the mainland for medical reasons and subsequently tested positive for COVID-19.

  • 4 February 2019
    Infrastructure, Project & Tenders

    Hurricane Energy has suffered another setback in its efforts to hook-up the Aoka Mizu FPSO to a buoy as part of the Early Production System development of the Lancaster field located in the West of Shetland area.

  • 27 March 2020
    Infrastructure

    Hurricane Energy has confirmed that a crew member on the Aoka Mizu FPSO at the Lancaster field has been evacuated to the mainland for medical reasons and subsequently tested positive for COVID-19.

  • 1 June 2018
    Equipment, Infrastructure

    Balltec has completed the manufacture, testing and delivery of twelve subsea mooring connectors for Bluewater Energy-owned Aoka Mizu FPSO. 

  • 13 September 2018
    Infrastructure, Project & Tenders

    Hurricane Energy has completed subsea installation for the Lancaster field Early Production System (Lancaster EPS) in the West of Shetland area and is ready for the arrival of the Aoka Mizu FPSO. 

  • 3 June 2016

    Oil company Nexen, a subsidiary of CNOOC, is pressing on with its decommissioning efforts of the Ettrick field located in the UK sector of the North Sea. According to Bluewater, the owner of the FPSO operating on the Ettrick field, the production from the field was scheduled to cease on June 1, 2016, after which the […]

  • 21 January 2019
    Infrastructure, Project & Tenders

    Hurricane Energy has encountered a problem during the hook-up stage of its Early Production System (EPS) development of the Lancaster field in the West of Shetland area.

  • 13 November 2018
    Infrastructure

    Hurricane Energy has informed that the Aoka Mizu FPSO has made a scheduled stop in Spain, which will be extended to complete some repairs. 

  • 19 November 2019

    London-listed oil explorer Hurricane Energy said on Tuesday that a drill stem test would begin on its Warwick West well in the West of Shetland area.

  • 6 January 2017
    Operations & Maintenance

    Oil company Nexen, a subsidiary of CNOOC, has submitted a plan for decommissioning of the Ettrick and Blackbird fields, located in the UK North Sea. Ettrick field, operated by Nexen, has been producing oil and gas through subsea wells tied back to the FPSO Aoka Mizu. Blackbird field was also tied back to the Aoka […]

  • 15 October 2018
    Infrastructure, Project & Tenders

    UK-based Hurricane Energy has announced the sail-away of the Aoka Mizu FPSO from a shipyard in Dubai. 

  • 19 March 2019
    Equipment, Infrastructure

    After previous failed attempts UK’s Hurricane Energy has successfully hooked-up the Aoka Mizu FPSO to the turret mooring system buoy at the Lancaster field located in the West of Shetland area.

  • 5 May 2016

    FPSO operator Bluewater has received a contract cancellation from Nexen for the FPSO Aoka Mizu producing from the Ettrick field in the North Sea.  According to Bluewater, production from the field will cease on June 1, 2016 and decommissioning of the vessel will start from that date. Redeployment opportunities for the FPSO Aoka Mizu are actively […]

  • 29 July 2010

    driving around in the harbour area , my attention was triggered by a highly illuminated ship , apperently just arriving from sea because tugboats where still manoeuvring her to some mooring buoys the aoka mizu is a FPSO , floating production storage and offloading vessel , used in the offshore oil industry , designed built […]

  • 6 March 2020
    Infrastructure

    Hurricane Energy and Spirit Energy, joint venture partners in the Greater Warwick Area (GWA) located in the West of Shetland region, have agreed a new cost allocation agreement as part of their 2018 farm-in deal.

  • 6 February 2020

    Hurricane Energy has revealed it will not tie back the Lincoln Crestal well, located in the West of Shetland region, for production through the Aoka Mizu FPSO this year.

  • 13 May 2019
    Infrastructure, Project & Tenders

    UK-based Hurricane Energy has marked the beginning of the start-up phase at the Lancaster field EPS located in the West of Shetland area following an introduction of hydrocarbons into the Aoka Mizu FPSO. 

  • 13 September 2018
    Operations & Maintenance

    Hurricane Energy, the UK based oil and gas company, has completed the installation of the subsea umbilical, risers and flowlines (SURF) for the Early Production System development of the Lancaster Field (Lancaster EPS). The installation marks the end of the offshore installation programme, the company noted. The final activity at the field will be a programme […]

  • 4 October 2017
    Business & Finance, Infrastructure

    UAE’s Drydocks World has signed an agreement for two new projects with Bluewater Energy Services and end client Hurricane Energy. The ship repair and construction company said on Wednesday that the yard would undertake a repair, life extension, and upgrade project on floating production storage and offloading (FPSO) vessel Aoka Mizu. The vessel will be […]

  • 14 February 2018
    Infrastructure, Project & Tenders

    Hurricane Energy has made progress on activities related to the Early Production System for the Lancaster field (Lancaster EPS) located West of Shetland with successful trial fit testing of buoy and FPSO turret.

  • 2 August 2018
    Equipment, Operations & Maintenance

    Hurricane Energy has informed that the turret mooring system, including the newly-constructed buoy for the Aoka Mizu FPSO, has been installed at the Lancaster field in UK. The installation, part of the LancaOster Early Production System (EPS) development, is a subject to final classification society approval. The company utilized the Normand Installer offshore construction vessel, together with […]

  • 31 May 2018
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Balltec has completed the manufacture, testing and delivery of twelve MoorLOK subsea mooring connectors on behalf of Bluewater Energy Services. The connectors will be used to moor Bluewater’s Aoka Mizu FPSO at Hurricane Energy’s Great Lancaster Area field in the North Sea. Bluewater’s engineering / expediting team selected Balltec’s MoorLOK connector based on weight, size […]