Search results for: Baltika

93 results

A list of search results

  • 20 December 2012
    Business & Finance

    On 18th of December, Western Baltija Shipbuilding delivered new fishing trawler hull (NB56) for the Norwegian client “Liegruppen Fiskeri AS”. The vessel is a sister ship to the newbuilding “LIAFJORD” (NB51) which was delivered on March. Length of this fishing trawler – 64.0 m, width – 13.8 m. Nine refrigerated sea water tanks (RSW) have […]

  • 22 August 2012

    In August, Western Baltija Shipbuilding, a Lithuanian shipyard belonging to BLRT Grupp, delivered the hull of fishing vessel Cattleya to Danish company Karstensens Skibsvaerft A/S. A hull made of steel and weighing 1080 tons was built for the trawler Cattleya on the shipyard of Western Baltija Shipbuilding in Klaipeda. The building of the vessel will […]

  • 20 December 2012

    Western Baltija Shipbuilding delivered a new fishing trawler hull (NB56) for the Norwegian client “Liegruppen Fiskeri AS” on 18th of December. The vessel is a sister ship to the newbuilding “LIAFJORD” (NB51) which was delivered on March. Length of this fishing trawler – 64.0 m, width – 13.8 m. Nine refrigerated sea water tanks (RSW) […]

  • 17 December 2012

    BLRT Grupp´s Turku shipyard has finished the repairs of oil tanker SCF Baltica. The specialists of ship-repair yard have dismantled machined, assembled back and balanced the shaft line and propeller (weight 35 tons) of the vessel. Also, main propulsion unit (B&W 7S60ME-C 16660 KW, 105 rpm, weight approximately 500 tons) was again aligned with shaft […]

  • 22 August 2012
    Business & Finance

    In August, Western Baltija Shipbuilding, a Lithuanian shipyard belonging to BLRT Grupp, delivered the hull of fishing vessel Cattleya to Danish company Karstensens Skibsvaerft A/S. A hull made of steel and weighing 1080 tons was built for the trawler Cattleya on the shipyard of Western Baltija Shipbuilding in Klaipeda. The building of the vessel will […]

  • 26 December 2019
    Research & Development

    PGE Group has launched a research project on the productivity of offshore wind farms, which is expected to help estimate the profitability of investments in the Baltica 2 and 3 projects. The aim of the study is to estimate the impact of wind slowdown caused by large projects in their surroundings, i.e. the so-called blockage effect. […]

  • 5 January 2012
    Business & Finance

    Western Baltija Shipbuilding, a subsidiary of BLRT Grupp, and the Danish company Gitte Henning A/S signed a contract for the construction of a fishing vessel Gitte Henning. This will be the first “turn-key” fishing vessel to be built at Western Baltija Shipbuilding, i.e. fully equipped and ready for operation. It is commonly known that the […]

  • 2 May 2013
    Business & Finance, Equipment, Technology, Vessels

    On the 29th of April 2013, Western Baltija Shipbuilding delivered a 2500 m3 TSHD turn-key dredger “Macuti“ to Johs. Gram-Hanssen A/S after a building period of 20 months. Extensive tests and trials of all systems kept Western Baltija Shipbuilding specialists busy in the last weeks. One week before the delivery, dredger “Macuti” was named at […]

  • 8 November 2013

    Terminal operator Cuxport has taken advantage of the booming offshore wind industry by becoming  a supply base for Regina Baltica, an accommodation vessel working for BARD Group over the last seven months. A variety of technicians and skilled workers were needed this year for the completion of  the BARD Offshore I wind park’s construction on […]

  • 2 May 2013

    Western Baltija Shipbuilding delivered, April 29th, a 2500 m3 TSHD turn-key dredger “Macuti“ to Johs. Gram-Hanssen A/S after a building period of 20 months. Extensive tests and trials of all systems kept “Western Baltija Shipbuilding” specialists busy in the last weeks. One week before the delivery, dredger “Macuti” was named at Western Baltija Shipbuilding 24 April […]

  • 7 February 2013

    Western Baltija Shipbuilding delivered a new fishing trawler hull (NB58) for the Danish client “Karstensens Skibsværft AS” on 1th of February. Fishing trawler hull “ASBJORN SELSBANE” is 55,0 m length and 12,80 m width. Refrigerated sea water tanks (RSW) with the 500m3 capacity, have been mounted onboard. Hull weight is 880 tons (950 tons with […]

  • 1 July 2013

    Western Baltija Shipbuilding has delivered multipurpose vessel “EVA“ to the client “EVA Maritime OÜ”. The multipurpose vessel “EVA” is the first vessel of this type built by Western Baltija Shipbuilding. Ship length – 89,9 m, breadth – 14,5 m, draft – 5,63 m, speed – 11,4 knots, deadweight – 4600 t. Vessel is equipped with […]

  • 21 November 2012

    Western Baltija Shipbuilding has delivered a hull of fishing trawler ROGNE to the Danish company Karstensens Skibsværft A/S on 13th of November, This vessel is analogous to another fishing trawler hull CATTLEYA which was delivered in August. The new vessel was equipped with pipeline, cable routes; main equipment and machinery were fastened and modern nonstandard […]

  • 18 December 2012
    Business & Finance

    BLRT Grupp´s Turku shipyard has finished the repairs of oil tanker SCF Baltica. The specialists of ship-repair yard have dismantled machined, assembled back and balanced the shaft line and propeller (weight 35 tons) of the vessel. Also, main propulsion unit (B&W 7S60ME-C 16660 KW, 105 rpm, weight approximately 500 tons) was again aligned with shaft […]

  • 12 February 2018
    Research & Development, Technology

    PGE Energia Odnawialna started a two-year wind measurement campaign for its planned 1GW offshore wind farm project, after deploying a floating LiDAR in the Polish Baltic Sea at the end of January. As Offshore WIND reported earlier, Spanish floating LiDAR specialist EOLOS supplied the EOLOS FLS200 LiDAR, designed for the offshore industry incorporating the ZephIR 300M […]

  • 10 April 2020
    Business & Finance, Business developments & projects

    PGE will close projects with unsatisfactory rate and those not directly related to its core business.

  • 30 January 2019
    Business & Finance

    Thirteen potential partners have responded to PGE Group’s invitation to develop offshore wind farm projects in the Polish Baltic Sea, Poland’s state-owned power company said. PGE intends to sell up to a 50% stake in two special purpose vehicles that are preparing the offshore projects with a combined capacity of up to 2,545MW, and to operate […]

  • 5 March 2010

    Russian investors would like to develop a coal terminal at Liepaja Port, according to the newspaper Bizness&Baltija. The planned investment is from EUR 50 to 100 million (LVL 35-70 million), but the time period for the implementation of the project has not been revealed… [mappress] Source: The Baltic Course, March 5, 2010;

  • 2 July 2013

    The hull of fishing vessel “HERØYHAV” was delivered from Western Baltija Shipbuilding on 28 June 2013 to Danish shipbuilding company Karstensens Skibsværft AS. The overall length of the fishing trawler’s hull is 69.95 m, breadth measures 15.0 m, while the depth of the main deck equals in 6.50 m. The vessel will be able to […]

  • 28 August 2015
    Environment, Research & Development

    PGE Energia Odnawialna S.A. has invited tenders for an environmental research with impact report that will assist in obtaining an environmental decision for an offshore wind farm in the Baltic Sea. The research project concerns the proposed offshore wind farm with connecting marine and land infrastructure, aiming to carry out geophysical surveys and environmental studies to assess the impact of the […]

  • 1 April 2016
    Business & Finance, Project & Tenders, Research & Development, Technology

    Polish wind farm developer PGE Energia Odnawialna S.A. has invited tenders for a study on the EW Baltica-3 offshore wind farm project. The project is located in the Polish Exclusive Economic Zone of the Baltic Sea, some 33km off the coast at the border of Slupsk Bank. The aim of the study is to conduct a two-year […]

  • 3 June 2014
    Business & Finance

    Shipbuilding yard Western Baltija Shipbuilding, which is a part of BLRT Grupp, has finished a turnkey project and delivered a multi-purpose cargo ship “Anetta”. According to Fjodor Berman, the Chairman of the Board of BLRT Grupp, building vessels from scratch, starting from the elaboration of a vessel’s concept and ending with the launching, has been […]