Search results for: Centralizers

37725 results

A list of search results

  • 9 January 2015
    Equipment

    Claxton, an Acteon company, has installed more than 5000 conductor guide centralizers, making the company the market leader for conductor centralizer installation in the North Sea and beyond. Conductor centralizers form the interface between the platform jacket and well conductor, assuring vital conductor integrity. Having supplied a range of conductor and structural centralizers to major […]

  • 14 January 2015
    Environment

    GDF Suez intends to double its power generation from renewables, with the main focus being on marine renewables, according to Reuters. The group operates 17.8 GW of renewable energy capacity worldwide, or 15 percent of its total, of which 7.8 GW is in Europe and 10 GW outside the region. By 2025 it wants to have […]

  • 18 April 2014

    Central Industry Group (CIG) announced a new repositioning and rebranding.  The group has renamed Vuyk Engineering Groningen to CIG Maritime Technology, Shipkits to CIG Shipbuilding and their German subsidiary Shippipe continues as CIG Piping Technology. This reflects their position within the supply chain. According to the company the rebranding exercise is part of CIG’s bigger vision […]

  • 10 March 2015
    Equipment, Operations & Maintenance, Project & Tenders

    Claxton Engineering Services, an Acteon company, has been awarded a contract with Statoil to supply conductor and internal centralizers to a minimum of 14 wells on the Gina Krog development, offshore Norway. The contract was finalised in December 2014, and first delivery is scheduled for March 2015. Claxton is responsible for the design, fabrication, testing […]

  • 12 July 2007

    A passenger ferry has sunk in central Philippines, leaving at least eight people dead and an unknown number missing, officials say. The MV Blue Water Princess sank off the town of San Francisco, about 220km (140 miles) south-east of Manila.

  • 25 December 2018
    Equipment, Operations & Maintenance

    Australia’s transcontinental submarine fibre optic cable, INDIGO Central, has now achieved ‘final splice’,  Superloop  informed. Final splice represents the conclusion of subsea cable installation creating a complete optical path from landing station to landing station. This follows INDIGO West achieving its final splice on Friday, December 21, creating the first submarine cable system connecting Singapore to Sydney, the […]

  • 9 September 2007

    Local state-owned shipbuilder Vinashin has obtained the go-ahead from central Vietnam’s Khanh Hoa province to invest in series of industrial parks and urban projects in Cam Ranh Bay. The company will invest in three industrial parks (IPs), including a Cam Ranh IP-township, the South Cam Ranh IP, and a site in northern Hon Qui.

  • 8 April 2013

    Americas Petrogas announced the discovery of gas and natural gas liquids on its Aguada Los Loros well, ALL.x-1, a vertical well that was drilled on the Los Toldos I block (98,300 gross acres or 398 square kilometers or 154 sections) in central Argentina. The ALL.x-1, which completed drilling in 2012, intersected the Vaca Muerta formation […]

  • 15 September 2014

    Central Petroleum has started the drilling program of the Gaudi-1 well. Currently, the rig is drilling ahead with 12 1/4″ Top hole at a measured depth of below 400m. Gaudi-1 is the second well in a program of unconventional gas exploration wells operated by Central (via subsidiary Merlin Energy in partnership with Total) and is being […]

  • 13 February 2015

    NYC-based PIRA Energy Group believes that how to store LNG becomes a central issue to the price.

  • 4 December 2014

    NYC-based PIRA believes that Europe is temporarily taking the central role for global LNG price formation.

  • 26 May 2014
    Business & Finance

    Dr. Christoph Vogel has been appointed new Group Senior Vice President of Vestas and President of Vestas Central Europe. Christoph, who comes from a position as Vice President & General Manager at Johnson Controls, enters into his new position on 1 June. Christoph has extensive global experiences across multiple businesses and functions. He has held […]

  • 25 June 2014
    Business & Finance, Equipment, Technology

    Dredge Central, LLC has completed and delivered three 18-inch booster pump assemblies to Construcciones José, S.A. de C.V., of Mazatlan, Sinaloa. These boosters will be placed into service on a long-pipeline project in the State of Sonora, dredging 1,310,000 cubic yards (1,000,000 cu.m) of sand to a maximum discharge distance of approximately 23,000 ft (7,000m). […]

  • 10 December 2015
    Business & Finance, Equipment, Technology

    The Central Dredging Association’s (CEDA) webinar, entitled “Adaptive Management for Dredging”, is scheduled for January 19, 2016 from 14:00-15:00 hrs CET. The webinar will be presented on behalf of the CEDA Environment Commission by Gerard van by Gerard van Raalte, Chairman of the CEDA Working Group on Adaptive Management, senior expert at Royal Boskalis Westminster/Hydronamic, […]

  • 22 November 2013
    Equipment

    Centek Group, the leading centralizer manufacturer, has introduced its UROS-CT centralizer targeted on tight casing applications in deep water wells. The UROS-CT is designed for use in tight tolerance casings where the centralizer is required to compress fully to travel between tight casing strings yet will expand to the designed open hole size. The UROS-CT […]

  • 29 September 2014
    Business & Finance, Equipment, Technology

    Transformation is underway in the eastern corner of the Central Marina as the Port of Everett’s major environmental cleanup at the former Everett Shipyard site moves forward. Crews have begun vibratory sheet pile installation for the new bulkhead. Dredging is scheduled to begin in early-October. Construction activity will continue through 2014, and is expected to […]

  • 23 February 2017

    TGS and Schlumberger have announced a new multi- and wide-azimuth (M-WAZ) multiclient reimaging program in the Central U.S. Gulf of Mexico. According to TGS, a Norwegian seismic specialist, final results are expected in early 2018, ahead of a period “when substantial block turnover in the area is anticipated.” The new Fusion M-WAZ reimaging program comprises […]

  • 5 December 2018
    Business & Finance, Project & Tenders

    The third phase of the Port of Everett’s Central Marina Improvements is well underway, reports the Port. Earlier this month, American Construction began dredging the waterway to authorized depths in the Central Marina. The public works contract to complete the Central Marina Improvements, was awarded to American Construction on September 11, 2018. When complete, the […]

  • 3 June 2016
    Business & Finance, Equipment, Technology

    An Italian customer, who already purchased three amphibious excavators from Waterking BV, has ordered another set of four WK machines. The first time, the customer showed interest for a WK 220 NG with Caterpillar upper structure and two WK 250 NG’s with Doosan upper structures with two sets additional pontoons with hydraulic spuds. This time, […]

  • 7 November 2018
    Business & Finance

    The U.S. Army Corps of Engineers, New Orleans District is hosting two public meetings to gather input on the feasibility study for hurricane protection and storm damage reduction for the South Central Coast of Louisiana. As the company reported yesterday, the study area includes Iberia, St. Martin, and St. Mary parishes and will look at […]

  • 24 December 2014
    Business & Finance, Equipment, Technology

    The commander of the U.S. Army Corps of Engineers (USACE) has signed a key ecosystem restoration report that allows Congress to consider the project for future authorization. The “chief’s report” for the Central Everglades Planning Project was signed yesterday by Lt. Gen. Thomas Bostick, USACE Commander and Chief of Engineers. It is the culmination of […]

  • 6 November 2014
    Business & Finance

    The Port of Everett’s contractor for the active environmental cleanup, Magnus Pacific, yesterday commenced dredging at the eastern corner of the Central Marina. The dredging portion of the project will continue through February 14, 2015. Regular working hours will be Monday through Saturday; 7 a.m. – 5 p.m.; however, dredging may also occur after hours from 5 p.m. […]