Search results for: Ems Harbour

33999 results

A list of search results

  • 3 July 2015
    Project & Tenders

    Gasunie and Groningen Seaports signed an agreement to research the possibilities of creating infrastructure in the Ems Harbour in the north of Groningen for the supply of LNG by ship, including the unloading and gaseous injection in the gas transport network.

  • 3 July 2015
    Project & Tenders

    Gasunie and Groningen Seaports signed an agreement to research the possibilities of creating infrastructure in the Ems Harbour in the north of Groningen for the supply of LNG by ship, including the unloading and gaseous injection in the gas transport network.

  • 3 May 2012

    On Tuesday the 1st of May Newbuilding 707 named Merweriver was delivered to its Dutch owner. The vessel, built and delivered at Marine Projects Ltd. Shipyard in Gdansk, is of the 4030 DWAT Bodewes Trader series. Merweriver is a Multi Purpose Dry Cargo Ship equipped for Containers and Strengthened for Heavy Cargo, SOLAS II – 2 […]

  • 18 January 2012

    The Disney Fantasy is expected to leave Papenburg on Friday night, 20 January 2012 to be conveyed down the river Ems to the North Sea. She is scheduled to arrive in Eemshaven on Saturday afternoon. After a short stop in port the test-and-adjust period will begin. The conveyance will take place in one go, assisted […]

  • 6 October 2015

    EMS Maritime Offshore GmbH (EMO) opened its Offshore Wind Terminal on 26 September in Eemshaven, the Netherlands. As the first step, a non-tidal floating jetty has been inaugurated in the Beatrix Harbour, where soon up to ten Crew Transfer Vessels (CTVs) may berth and can be supplied at the same time. Marijke van Beek, Mayor […]

  • 6 October 2015

    EMS Maritime Offshore GmbH (EMO) opened its Offshore Wind Terminal on 26 September in Eemshaven, the Netherlands. As the first step, a non-tidal floating jetty has been inaugurated in the Beatrix Harbour, where soon up to ten Crew Transfer Vessels (CTVs) may berth and can be supplied at the same time. Marijke van Beek, Mayor […]

  • 4 April 2013
    Business & Finance, Equipment, Technology

    Kongsberg Maritime will introduce the new EM 2040 Compact, a sophisticated multibeam echo sounder for high resolution mapping and inspection applications, during Ocean Business 2013. Based on the state-of-the-art EM 2040 multibeam, the EM 2040C is a significant development in acoustic technology that makes highly detailed surveys of shallow water possible using small boats and […]

  • 12 December 2013
    Business & Finance, Equipment, Technology

    At the marina Muiderzand, in The Netherlands this October, Kongsberg customers gathered together to experience the impressive EM2040 Compact multibeam system on board the survey vessel Havenschap 1, owned by Groningen Seaports. The Havenschap 1 has a moonpool mounting configuration for the EM2040C single sonar head together with a dual frequency single beam transducer; a […]

  • 12 December 2013
    Business & Finance

    At the marina Muiderzand, in The Netherlands this October, KONGSBERG customers gathered together to experience the impressive EM2040 Compact multibeam system on board the survey vessel Havenschap 1, owned by Groningen Seaports. The Havenschap 1 has a moonpool mounting configuration for the EM2040C single sonar head together with a dual frequency single beam transducer; a […]

  • 20 July 2013
    Business & Finance

    DEME Announces New Contracts Worth EUR 250 Million Within the DEME group recently, a great many assignments for large, energy-related projects have been awarded to a range of different companies.   Durres Port Development: Dredging is Major Factor for Success (Albania) EMS Albanian Port Operator Shpk officially started operations at the East Terminal in the […]

  • 4 April 2013
    Business & Finance, Equipment

    Kongsberg Maritime will introduce the new EM 2040 Compact, a sophisticated multibeam echo sounder for high resolution mapping and inspection applications, during Ocean Business 2013. Based on the state-of-the-art EM 2040 multibeam, the EM 2040C is a significant development in acoustic technology that makes highly detailed surveys of shallow water possible using small boats and […]

  • 25 March 2014
    Research & Development, Technology

    MMT Group has acquired a Kongsberg EM2040D. A 0.4 x 0.7 degree dual head multibeam system has recently been installed on MMT’s long term charted multipurpose support vessel (MPSV) Stril Explorer. This is a highly developed multibeam echo sounder that combines all of the advanced features of deepwater echo sounders to the shallower water or […]

  • 7 July 2017
    Business & Finance, Equipment, Operations & Maintenance

    MacArtney France has supplied multibeam solution for the bathymetric vessel ‘Ingénieurs Lesbordes’ to carry out surveys close to the harbour of Bayonne in the south-west of France, and has carried out modification which were imperative to the successful adaptation of the vessel to the prevailing IHO survey standards. Located on the western border between Basque Country […]

  • 15 February 2015
    Business & Finance

    Anthem of the Seas, the latest cruise ship being built by Germany’s Meyer Werft, will leave the building dock II of the company’s Papenburg shipyard on Saturday, February 21. The 168.600-gt cruise ship Anthem of the Seas, one of the largest cruise ship in the world, is scheduled to leave the shipyard’s covered building dock II early […]

  • 13 December 2011
    Business & Finance, Operations & Maintenance, Research & Development

      Statoil has awarded Kongsberg Oil & Gas Technologies a contract worth NOK 150 million over three years to develop the world’s first integrated environmental monitoring system (EM) for oil and gas activities. Statoil currently employs several environmental monitoring methods at its installations, mainly on the Norwegian continental shelf. However, there are no solutions available […]

  • 13 December 2011
    Business & Finance, Equipment

    Statoil has awarded Kongsberg Oil & Gas Technologies a contract worth NOK 150 million over three years to develop the world’s first integrated environmental monitoring system (EM) for oil and gas activities. Statoil currently employs several environmental monitoring methods at its installations, mainly on the Norwegian continental shelf. However, there are no solutions available on […]

  • 5 January 2012

    The new cruise ship for the U.S. cruise company Disney Cruise Line​ (Orlando), the Disney Fantasy, will leave MEYER WERFT’s covered building dock on Sunday, 8 January 2012. Around 11 a.m. the new ship will slowly be floated out of the covered hall, followed by a couple of tests and trials to be performed while […]

  • 5 January 2012
    Business & Finance

    The new cruise ship for the U.S. cruise company Disney Cruise Line​ (Orlando), the Disney Fantasy, will leave MEYER WERFT’s covered building dock on Sunday, 8 January 2012. Around 11 a.m. the new ship will slowly be floated out of the covered hall, followed by a couple of tests and trials to be performed while […]

  • 27 February 2015

    The following video presents you with the 168.600-gt cruise ship Anthem of the Seas, one of the largest cruise ships in the world, being turned around after its float out at Meyer Werft’s Papenburg shipyard on February 21st, 2015. After this giant beauty turned around, the shipyard workers mounted the North Star observation toweer on […]

  • 11 March 2015
    Business & Finance

    Royal Caribbean’s new cruise ship Anthem of the Seas was safely and successfully conveyed to the open sea, the ship’s builder, Germany’s Meyer Verft informed. The river passage started in Papenburg on Tuesday, March 10 at about 14.30 pm. At around 3.15 am today the ship passed the river Ems barrier in Gandersum. In the […]

  • 24 February 2015
    Business & Finance

    Royal Caribbean’s cruise ship Anthem of the Seas, under construction at German shipyard Meyer Verft, left the covered building dock of the shipyard on Saturday, February 21th, 2015. The 168.600-gt cruise ship Anthem of the Seas, one of the largest cruise ships in the world, left the building dock around 01:00 pm, the shipyard said. Following […]

  • 29 October 2013

    On November 2nd 2013 the 146,600-gt cruise ship Norwegian Getaway, whose construction has taken merely 12 months, will float out of MEYER WERFT’s covered building dock II. Over the last few weeks the shipyard has been busy conducting extensive tests and machinery trials. The float-out of the ship, which is built for the US cruise […]