Search results for: Heerema Fabrication Group

49853 results

A list of search results

  • 6 November 2015
    Equipment

    Heerema Fabrication Group (HFG), an engineering and fabrication contractor for offshore structures to the oil and gas industry, has opened the Heerema Innovation Center. The new center is located near the Group’s headquarters, in Zwijndrecht, the Netherlands. According to Heerema, the first project for the Heerema Innovation Center is the welding robot, which has been developed […]

  • 31 December 2018
    Business & Finance

    Italian offshore industry player Rosetti Marino will not be proceeding with the previously proposed acquisition of the Dutch Heerema Fabrication Group’s Zwijndrecht yard in the Netherlands.

  • 3 October 2012

    Dutch engineering and fabrication company Heerema Fabrication Group (HFG) was already a well known player in the oil & gas industry, when around five years ago, the offshore wind industry was just really setting off. Then HFG was asked whether they could build some small platforms for this new industry. With the company’s vast experience […]

  • 7 March 2013

    Dutch Heerema Fabrication Group (HFG) has announced that Arend Drenthe, Chief Financial Officer, and HFG have jointly decided to end their relationship with immediate effect. Arend Drenthe will continue his career outside the Heerema Group. “We want to thank Arend for his contribution to the company and wish him all the best in his future […]

  • 2 November 2016
    Business & Finance

    Heerema Fabrication Group (HFG) has made a decision to implement a reorganization of the company due to poor market conditions in the oil and gas industry. As a result of the restructuring, an anticipated 450 of the existing 770 jobs in the company will be phased out, the company informed. The job losses will affect the head […]

  • 15 April 2014

    Heerema Fabrication Group has completed construction of the Cygnus Alpha topsides structure which will be a part of an offshore platform installed at the Cygnus field, in the UK North Sea. The 1,640 tonne Cygnus Alpha Wellhead topsides is now at Heerema’s Hartlepool yard loaded on a barge, waiting to be shipped to its North Sea […]

  • 19 January 2015
    Equipment

    Heerema Fabrication Group and Maersk Oil on Friday, January 16, held a ceremony to mark the start of construction of the Culzean Wellhead Platform jacket. The ceremony, where the first steel plate was cut for the Culzean WHP jacket was held at Heerema Vlissingen yard in the Netherlands. Culzean is an Ultra High Pressure High Temperature Development field, […]

  • 28 March 2014
    Technology

    Preparations for the loading of Siemens’ HelWin beta jacket are in full swing at Heerema Fabrication Group’s Vlissingen yard, the company informed via social media. The 3,500-ton jacket will be moved on site to the quayside for the loading on a barge. In June 2012, Siemens awarded Heerema Fabrication Group (HFG) a contract that comprises […]

  • 27 July 2017
    Business & Finance

    Siemens AG has awarded Heerema Fabrication Group (HFG) a Procurement & Construction contract for the Offshore Transformer Module (OTM) which will be installed at EnBW’s Albatros offshore wind farm.

  • 28 March 2014
    Technology

    Preparations for the loading of Siemens’ HelWin beta jacket are in full swing at Heerema Fabrication Group’s Vlissingen yard, the company informed via social media. The 3,500-ton jacket will be moved on site to the quayside for the loading on a barge. In June 2012, Siemens awarded Heerema Fabrication Group (HFG) a contract that comprises […]

  • 1 December 2013
    Business & Finance

    Facility plays a key role in the fabrication of small constructions and securing qualified workmanship for HFG

  • 17 April 2012
    Business & Finance

    Centrica Energy’s York platform, built by Heerema Fabrication Group (HFG) at its Hartlepool fabrication yard, reaches its completion and will be the first to be installed in the North Sea this year. The normally unmanned York platform, which will be located in the Southern North Sea, 40km east of Humberside, will produce enough gas to […]

  • 2 November 2016
    Business & Finance

    The Netherlands-based Heerema Fabrication Group (HFG) plans to lay off 450 of the existing 770 employees at the company’s head office in Zwijndrecht, as well as at its yards in the Netherlands, United Kingdom and Poland, partly due to ”the combination of price pressure and unfavourable contractual conditions in the wind energy market”. Other reasons for the lay-offs are […]

  • 20 November 2018
    Business & Finance, Operations & Maintenance

    Heerema Fabrication Group (HFG) said it intends to divest a significant part of its activities in the field of design and fabrication of complex steel constructions for the offshore market. “HFG has been struggling for some time with insufficient project volume and marginal profitability. In addition, the risks associated with building topsides are high and […]

  • 14 April 2014
    Operations & Maintenance, Storage

    On Friday, the HelWin beta jacket was completed and sailed to its offshore location in the German sector of the North Sea from the fabrication facilities of Heerema Fabrication Group (HFG) in Vlissingen. Siemens’ HelWin beta jacket was successfully loaded onto the barge on March 31, after Heerema Fabrication Group undertook necessary preparations for the work. […]

  • 14 April 2014
    Operations & Maintenance, Storage

    On Friday, the HelWin beta jacket was completed and sailed to its offshore location in the German sector of the North Sea from the fabrication facilities of Heerema Fabrication Group (HFG) in Vlissingen. Siemens’ HelWin beta jacket was successfully loaded onto the barge on March 31, after Heerema Fabrication Group undertook necessary preparations for the work. […]

  • 21 April 2014
    Storage, Technology

    The jacket of the HelWin beta HVDC platform has been successfully placed at its position in the German part of the North Sea, Heerema Fabrication Group informed via social media. After Heerema Fabrication Group had finished building the HelWin beta jacket at its yard in Vlissingen, the structure sailed away to its location on April […]

  • 21 April 2014
    Storage, Technology

    The jacket of the HelWin beta HVDC platform has been successfully placed at its position in the German part of the North Sea, Heerema Fabrication Group informed via social media. After Heerema Fabrication Group had finished building the HelWin beta jacket at its yard in Vlissingen, the structure sailed away to its location on April […]

  • 19 April 2012
    Business & Finance, Equipment

    Groundbreaking projects built by Heerema Fabrication Group to be showcased throughout the UK and Netherlands in the two part series ‘Mega Rigs’ on Discovery Channel. The series, produced by Discovery Channel, will follow the story of Centrica Energy’s F3-FA and Ensign projects from the design stages through the build and installation phases to production, as […]

  • 2 December 2013
    Business & Finance

    Heerema Fabrication Group (HFG), a leading engineering and fabrication contractor, announced the opening of their new fabrication facility in the south of Poland, Opole. The official opening of the facility is performed by Mr Pieter Heerema. The growing demand of qualified prefabrication of small offshore steel structures and substructures for HFG’s fabrication yards and the […]

  • 7 March 2013
    Authorities & Government

    The Dutch Minister of Economics Henk Kamp visited Heerema Fabrication Group’s fabrication location in Zwijndrecht on 4 March. HFG showed the Minister 2 offshore wind platforms under construction. Grid operator TenneT will connect these so called ‘power sockets at sea’ windfarms in the German part of the North Sea to the high voltage grid onshore. […]

  • 9 June 2014
    Storage, Technology

    Heerema has successfully loaded the HVDC topside of Siemens’ HelWin beta platform onto a seagoing barge. On Saturday, the HelWin beta topside was loaded onto the H-542 barge, operated by Heerema Marine Contractors, a sister division of Heerema Fabrication Group, which built the platform. In October 2012, Heerema started the construction of the 10,200-ton HVDC […]