  • 5 January 2015
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    McDermott has been awarded a contract to install the offshore jacket, deck and piles for the Ayatsil-A drilling platform for PEMEX  in the Bay of Campeche Ayatsil field. The value of the award is included in McDermott’s fourth quarter backlog. “The Ayatsil-A installation award from PEMEX is a direct result of the substantial local capabilities […]

  • 31 October 2019
    Business & Finance, Operations & Maintenance, Project & Tenders

    Subsea 7’s renewables and heavy lifting business unit, Seaway 7, has been awarded a contract by Jan de Nul for the Formosa 2 offshore wind farm project in Taiwan. The contract scope includes the transportation, pre-piling and installation of 47 jacket foundations for wind turbines. Seaway 7 will execute the work in 2020 and 2021 […]

  • 14 November 2017
    Business & Finance, Equipment, Operations & Maintenance

    The second part of the foundation installation campaign at the Beatrice offshore wind farm site will start with the return of the Seaway Heavy Lifting’s largest vessel, Oleg Strashnov, and its associated support vessels. The vessel is scheduled to carry out the installation works for approximately one month, starting November 16. Eighty four jackets will […]

  • 2 January 2017
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders, Research & Development

    Subsea World News has put together a recap of the most popular videos of 2016. Top videos include installation of subsea templates on Maria field offshore Norway, setup of the Ayatsil-C jacket in the Bay of Campeche, the construction of the wellhead platform jacket for Maersk Oil’s Culzean field, the installation of subsea flowlines for Ichthys LNG project and the […]

  • 4 November 2015
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Heerema Fabrication Group informed that preparations are being made for the sail away of the Alba B3 jacket to Equatorial Guinea for Marathon Oil’s Alba field third gas compression platform. Heerema is the main EPCI contractor for the 6,000-ton Alba B3 compression platform. The 1500-tons jacket has been loaded onto the seagoing barge after the […]

  • 18 November 2016
    Operations & Maintenance

    The video above shows preparation and setup of the Ayatsil-C jacket in the Bay of Campeche, Mexico, by McDermott team. McDermott secured the contract for the engineering, procurement, construction and installation (EPCI) of the jacket from Pemex in 2015. The contract is the fourth one McDermott received for the Ayatsil field development project, the company noted […]

  • 4 August 2018
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders, Research & Development

    Subsea World News has put together a recap of the most interesting articles from the previous week (July 30 – August 05). Naval Energies Shelves Tidal Energy Plans with OpenHydro in Liquidation INPEX Begins Gas Production from Ichthys Project TenneT Sees Borssele Jacket Ready and Set for Setup McDermott Hires Royal IHC for Amazon Modification […]

  • 30 July 2018
    Business & Finance, Equipment, Operations & Maintenance

    The 55 meters high jacket for TenneT’s first offshore platform in the Borssele wind farm zone has been completed. The load-out of the jacket at the HSM Offshore shipyard in Schiedam is the first milestone for TenneT in the realization of the Borssele Offshore Wind Farm Zone project. During the load-out, the jacket was loaded […]

  • 8 August 2018
    Business & Finance

    Danish Bladt Industries and the Taiwan-based Century Wind Power (CWP) have established a joint venture for the fabrication of offshore wind foundations for the Taiwanese market.

  • 16 May 2017
    Business & Finance, Operations & Maintenance

    Seaway Heavy Lifting, wholly-owned subsidiary of Subsea 7, has completed installation of the Galloper offshore wind farm substation and associated jacket foundation. The company’s heavy-lift vessel ‘Oleg Strashnov’ executed the job last Friday, May 12. Heerema Fabrication Group has manufactured the both components for the 336MW offshore wind farm being constructed approximately 30 kilometers off […]

  • 22 July 2015
    Research & Development

    To help DONG Energy gain a better understanding of the effects of wave loads on offshore wind turbine foundations including secondary structures, DHI has performed physical model tests and conducted numerical simulations to analyse wave-structure interaction. DONG Energy wanted to gain a better understanding of the hydrodynamic loading on wind turbine foundations with secondary structures attached and improve […]

  • 31 March 2020
    Project & Tenders

    Offshore Wind With over 50 years of experience in the construction, manufacturing, supply and assembly of steel structures, Smulders was the logical choice for offshore wind structures back in the pioneering days of wind energy almost 20 years ago. Today, Smulders is an established market leader that offers a full range of services from engineering […]

  • 30 June 2017
    Project & Tenders, Storage

    A detailed design of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid project being developed by Belgian transmission system operator Elia will soon be open for construction tendering, Ramboll informed. 

  • 6 February 2013

    At the European Wind Energy Association (EWEA) Conference in Vienna, GL Garrad Hassan marked the 20th anniversary of the launch of Bladed, the wind turbine design software trusted and used by manufacturers and certification agencies around the world. Over the last two decades, as commercial wind turbines have grown in scale, from 500kW to over […]

  • 29 December 2014

    While the industry is looking at ways to assemble a turbine onshore so it can be installed at sea in one operation, at the moment the common method still is to install it in several stages at sea. The foundations are installed first and followed by the tower and the WTG. Whether the foundations are […]

  • 20 September 2018
    Business & Finance, Equipment, Operations & Maintenance, Research & Development

    The patented iJacket is said to be more structurally optimized than the conventional true X-braced jacket design, supporting the same deck load, conductor/riser count, drilling deck, wind turbine or other payload as its conventional counterpart.

  • 19 September 2017
    Technology

    Trelleborg’s engineered products operation has added to its portfolio of offshore floatover solutions with a custom designed skirt pile gripper (SPG).

  • 8 June 2017
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Allspeeds, manufacturer of Webtool hydraulic cutting systems, has supplied 12 softline cutters to Resolve Marine for a decommissioning project offshore Mumbai. For the decommissioning project, the Webtool softline cutters will be used to cut 76mm (3 inch) diameter Dyneema softline rope. The 127mm cutters will be positioned on fibre rope, soft eye slings and activated […]

  • 7 October 2016
    Business & Finance, Equipment, Operations & Maintenance

    Four piling cluster and two sets flotation tanks, with a total steel weight of close to 7,000 tons, arrived at Kvaerner’s yard in Verdal from Dubai this week . The structures will be installed on the first and largest steel jacket for the Johan Sverdrup projects, currently under construction at Verdal. This is the first of two […]

  • 22 June 2020
    Business & Finance, Business developments & projects, Equipment, Heavy lifting, Project & Tenders, Vessels

    Allseas’ heavy lift vessel Pioneering Spirit has completed its first decommissioning job of this summer, the single-lift removal of Shell’s Brent Alpha platform from the North Sea.

  • 20 September 2019
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Repsol Norge has awarded Allseas an EPRD contract for the removal, transfer, load-in to shore and disposal of its Gyda platform in the Norwegian North Sea. The contract covers both the 18,000t topsides and 11,200t jacket, and includes an option for reinstallation on another field, which would be an unprecedented step for a fixed installation […]

  • 28 April 2015
    Equipment

    FoundOcean, a construction grouting company from UK, has completed the grouting for the Ayatsil A drilling platform jacket. The jacket was constructed for the Mexican oil company PEMEX. FoundOcean conducted this job as a subcontractor for McDermott, a company responsible for the installation of the facility at the Ayatsil field, in the Bay of Campeche, […]