Search results for: Jumbo Javelin

446 results

A list of search results

  • 3 May 2013

    One of Jumbo’s heavy lift & installation vessels, the Fairplayer, is in Rotterdam preparing for a subsea installation project. Jumbo’s Fairplayer will be executing the installation of the mooring spread for the EnQuest Producer FPSO. This FPSO will be operating at the Alma and Galia fields, located in Blocks 30/24, 30/25 and 30/29, 310km south-east […]

  • 25 September 2018
    Infrastructure

    Malaysia’s Sapura has hired Dutch Jumbo to perform the transportation and installation of an FSRU Mooring System including riser and umbilical, off the coast of Aracaju, Sergipe, Brazil.

  • 22 April 2010

    Jumbo Offshore’s crew, engineers and subcontractors have successfully completed the first leg of their current Transition Piece (TP)… [mappress] Source: pennenergy, April 21, 2010;

  • 13 June 2014

    In just over 2 months Ballast Nedam Offshore has installed 47 out of 80 monopiles on the Butendiek Offshore Wind Farm. The installation works started at the 1st of April and on the 10th of June monopile no. 47 was installed. This demonstrates reliable approach based on one of the proven installation concepts in combination with one of […]

  • 13 June 2014
    Business & Finance, Equipment, Operations & Maintenance

    In just over 2 months Ballast Nedam Offshore has installed 47 out of 80 monopiles on the Butendiek Offshore Wind Farm. The installation works started at the 1st of April and on the 10th of June monopile no. 47 was installed. This demonstrates the reliable approach based on one of the best proven installation concepts […]

  • 5 July 2012

    During the last six months, a lot of effort has been put into the construction of Denmark’s largest offshore wind farm, the Anholt Offshore Wind Farm.  DONG Energy’s Project Manager, Claus Bøjle Møller, has been overall responsible for the construction project and gave a status of the last six months: ”If I don’t take the daily […]

  • 1 August 2012
    Business & Finance, Equipment, Operations & Maintenance

    The last of the 111 transition pieces has now been installed on monopile no. 111 in Anholt Offshore Wind Farm. This means that all foundations for Anholt Offshore Wind Farm are in place, and DONG Energy is well on its way in the construction of Denmark’s largest offshore wind farm. The next step is the […]

  • 1 August 2012

    The last of the 111 transition pieces has now been installed on monopile no. 111 in Anholt Offshore Wind Farm. This means that all foundations for Anholt Offshore Wind Farm are in place, and DONG Energy is well on its way in the construction of Denmark’s largest offshore wind farm. The next step is the […]

  • 15 December 2014

    In the very first edition of Offshore WIND we reported on access systems as the means for safe transfers of personnel to offshore wind turbines. At that time it was still a relatively new topic in this industry. We discussed the systems by Dutch company Ampelmann Operations B.V. and by Offshore Solutions. Now, five years […]

  • 15 December 2014

    In the very first edition of Offshore WIND we reported on access systems as the means for safe transfers of personnel to offshore wind turbines. At that time it was still a relatively new topic in this industry. We discussed the systems by Dutch company Ampelmann Operations B.V. and by Offshore Solutions. Now, five years […]

  • 5 April 2012

    With wind farms getting bigger and bigger it means that the need for materials and personnel is also growing. The previous article described this growth in the need for support vessels sailing to and from wind farms under construction, or needing maintenance, transferring materials and personnel. But when do the support vessels stop being the only solution for transferring […]

  • 5 April 2012

    With wind farms getting bigger and bigger it means that the need for materials and personnel is also growing. The previous article described this growth in the need for support vessels sailing to and from wind farms under construction, or needing maintenance, transferring materials and personnel. But when do the support vessels stop being the only solution for transferring […]

  • 3 April 2006

    The Swiss-Swedish power and automation technology group ABB said on Monday (3 April) that it has received new marine electricity and propulsion system orders for a total of USD110m.

  • 17 August 2009

    Huisman, the Dutch-based worldwide specialist in lifting, drilling and subsea solutions, has currently expanded its heavy lifting product range with a customised range of Wind Turbine Installation Cranes. Building on the successful operation of the existing Huisman heavy lifting equipment for the installation of wind turbines and the increasing demand for customised equipment by the […]

  • 22 December 2014

    The Dutch excel in maritime services, a history that can be traced back to the days of the first explorers. Even then the abundance of waterways in their own country were not enough for the Dutch traders. Curious and creative minded and always looking out for new opportunities, they explored the waters beyond the boundaries […]

  • 18 May 2015

    While crew transfer vessels have originally been the main source for transferring technicians and engineers and their work tools to and from the wind farms, the growing trend of wind farms being, and to be built, further at sea has proven to provide quite some challenges for this sector. A challenge not only to maintain or […]

  • 2 October 2012

    In the past 12 months we have seen orders for new Wind Turbine Installation Vessels placed, new builds started and others completed and delivered. These vessels have got bigger and stronger’wlth larger cranes, and higher jacking possibilities. The specifications of almost every dimension have increased. Offshore WIND has spoken to some of the new owners […]

  • 6 December 2012
    Business & Finance, Operations & Maintenance, Project & Tenders

    Jumbo has been awarded a FPSO mooring, installation and hook-up contract by EnQuest. EnQuest is redeveloping the Ardmore and Duncan fields as Alma and Galia respectively. The project scope is the mooring spread installation and FPSO tow out and hook up. This will be the first offshore project in which Jumbo acts as the main […]

  • 28 November 2011
    Business & Finance, Operations & Maintenance

    On 25th September 2011, Jumbo Shipping brought the J-lay tower back home from Port Gentil, Gabon to the port of Flushing, the Netherlands. Jumbo lifted the almost 1800t weighing pipeline production facility from Subsea 7’s Pipe Laying barge Acergy Polaris onto its J-type Fairpartner. The tower will be undergoing maintenance and reinstalled on board the […]

  • 4 January 2012
    Business & Finance, Operations & Maintenance

    In 2011 Jumbo Shipping successfully completed its scope of work as awarded by client Technip for the ASENG field located off the coast of Equatorial Guinea in West Africa. This field is to be developed as a standalone turret moored FPSO with subsea production, water injection and gas injection wells at 5 locations. Jumbo’s scope […]

  • 5 January 2012
    Business & Finance

      In 2011 Jumbo Shipping successfully completed its scope of work as awarded by client Technip for the ASENG field located off the coast of Equatorial Guinea in West Africa. This field is to be developed as a standalone turret moored FPSO with subsea production, water injection and gas injection wells at 5 locations. Jumbo’s […]

  • 28 November 2011
    Business & Finance

    On 25th September 2011, Jumbo Shipping brought the J-lay tower back home from Port Gentil, Gabon to the port of Flushing, the Netherlands. Jumbo lifted the almost 1800t weighing pipeline production facility from Subsea 7’s Pipe Laying barge Acergy Polaris onto its J-type Fairpartner. The tower will be undergoing maintenance and reinstalled on board the […]