Search results for: Lula Field

38428 results

A list of search results

  • 27 July 2015
    Equipment

    Aker Solutions in Brazil delivered the first Christmas Tree for Petrobras’ FA 2011 60 XMT project before the contract deadline, the company informed through social media. “The great execution is due to good planning from the start of the project, including steps such as engineering, release of purchasing materials and supplier delivery time and production,” […]

  • 29 April 2011
    Business & Finance

      Petrobras has started the Extended Well Test (EWT) in the northeastern part of Lula Field, in the Santos Basin pre-salt reserves, about 300 kilometers off the coast of Rio de Janeiro. The EWT is under way on the BW Cidade de São Vicente FPSO, anchored at a depth of 2,120 meters. Output should be […]

  • 29 December 2015

    Brazilian oil giant Petrobras has deployed another floating production storage and offloading vessel at the Santos basin, offshore Brazil. The FPSO Cidade de Marica left the Brasa shipyard in Niteroi on December 19, and reached its offshore location at the Lula oil field on December 25. The 346.5 meters long Cidade de Marica is the […]

  • 18 May 2017
    Infrastructure, Project & Tenders

    Brazilian oil company Petrobras has started oil and natural gas production in the area of Lula Sul (South), at the Santos Basin pre-salt, through FPSO P-66. The FPSO unit left the shipyard and headed to its offshore location in February and, following arrival and hook up, production started on Wednesday, May 17. Lula field is operated by […]

  • 22 December 2015

    Brazil’s state-owned oil company Petrobras has informed that the floating, production, storage and offloading vessel (FPSO) Cidade de Saquarema, destined for its Lula field, has docked at the Niteroi, Rio de Janeiro-based Brasa shipyard. The FPSO will operate in a water depth of 2200 meters and is scheduled to start operating in the Lula field in the pre-salt […]

  • 27 July 2015
    Equipment

    Aker Solutions, an oil services company, has delivered the first christmas tree for Petrobras’ FA 2011 60 XMT project. According to Aker Solutions, the christmas tree was delivered to Brazil’s state-owned oil company before the contract deadline. “The great execution is due to good planning from the start of the project, including steps such as […]

  • 6 June 2016

    Brazilian state-owned oil company Petrobras has informed that its pre-salt oil production has reached over 1 million barrels per day, accounting for 40% of oil production from Petrobras-operated facilities in Brazil.  According to Petrobras, on May 8, oil production from facilities operated by the oil company in the Brazilian pre-salt layer broke a new record, […]

  • 29 December 2010
    Business & Finance, Project & Tenders

    Petrobras, as the operator of Block BMS-11, located in the Santos Basin, announces that it submitted today the Declaration of Commerciality of the oil and gas accumulations in the Tupi and Iracema areas to the National Petroleum Agency (ANP). In the proposal submitted to the ANP, the names suggested for these accumulations were Lula Field […]

  • 1 February 2019
    Business & Finance, Infrastructure

    Brazilian oil company Petrobras has kicked off oil and gas production from its Lula Norte area in the Santos Basin.

  • 7 April 2014
    Business & Finance, Operations & Maintenance

    Petrobras announces the start-up of well 7-SPH-04-SPS, at a water depth of 2,120 meters, in Sapinhoá field, in the Santos Basin Pre-Salt Region. This well has an estimated production potential of 26,000 barrels of oil per day (bpd) and is interconnected to FPSO Cidade de São Paulo through the pioneering platform connecting system known as […]

  • 6 July 2015
    Project & Tenders

    The floating production, storage and offloading (FPSO) vessel Cidade de Itaguaí has arrived in Lula field, offshore Brazil.  According to Petrobras, the FPSO Cidade de Itaguaí is now anchored in the Iracema Norte area of Lula field, in the Pre-Salt layer of Santos Basin, off the coast of Rio de Janeiro. The platform-ship is able […]

  • 7 April 2014

    Petrobras has announced the start-up of the well 7-SPH-04-SPS, at a water depth of 2,120 meters, in Sapinhoá field, in the Santos Basin Pre-Salt Region. The well, which started flowing oil on Thursday, April 3rd,  has an estimated production potential of 26,000 barrels of oil per day (bpd) and is interconnected to FPSO Cidade de São […]

  • 12 May 2014

    Petrobras on Friday began production from well 7-LL-22D-RJS in the Santos Basin’s Presalt Lula field (Lula NE Pilot area). This well, with a production potential of 26 thousand barrels per day (bpd), is connected to FPSO Cidade de Paraty via a new platform-connection system deployed for the first time in the Lula field. Using this […]

  • 7 May 2014
    Business & Finance, Equipment, Project & Tenders

    Saipem has won four new Engineering & Construction contracts, onshore in Saudi Arabia and offshore in Brazil, for a total amount of approximately $4 billion. Saipem has been awarded by Saudi Aramco three contracts in Saudi Arabia for onshore engineering and construction activities. Two EPC contracts relevant to the Jazan Integrated Gasification Combined Cycle project […]

  • 16 January 2018
    Infrastructure

    A fire broke out aboard a Petrobras-operated FPSO early on Tuesday, the Brazilian oil company has informed.

  • 14 July 2016
    Infrastructure

    Offshore Energy Today reported earlier this week that Petrobras brought the SBM Offshore-owned FPSO Cidade de Saquarema online by connecting it to the first production well on the Lula field, located in the Santos Basin offshore Brazil.  SBM Offshore, a Dutch provider of floating production storage and offloading (FPSO) vessels, has launched a video showing […]

  • 6 July 2015

    The floating production, storage and offloading unit (FPSO) Cidade de Itaguaí is now anchored in the Iracema Norte area of Lula field, in the Pre-Salt layer of Santos Basin, off the coast of Rio de Janeiro. The platform-ship is able to produce 150,000 barrels of oil and compress 8 million cubic meters of natural gas […]

  • 7 February 2017
    Infrastructure

    Brazilian oil company Petrobras has informed that the P-66 FPSO has left the Brasfels shipyard in Angra dos Reis, Rio de Janeiro and is on its way the Lula Sul module in the Lula field.

  • 13 July 2016
    Operations & Maintenance

    SBM Offshore informed that the FPSO Cidade de Saquarema is formally on hire after achieving first oil. The FPSO is installed in the Lula field (BM-S-11 contract) in the pre-salt province offshore Brazil. It will operate under a 20-year charter with Tupi BV as well as an operations contract with the BM-S-11 consortium. The BM-S-11 block is under […]

  • 17 May 2018
    Infrastructure

    Petrobras’ April production was 2.68 million barrels of oil equivalent per day

  • 13 November 2018
    Infrastructure

    Petrobras has started the production of oil and natural gas in the Búzios 2 area, in the pre-salt of Santos Basin, by means of P-75 FPSO, which is the second unit installed in the Búzios field.

  • 3 May 2011
    Business & Finance, Operations & Maintenance, Project & Tenders

    Saipem has been awarded new E&C Offshore contracts worth in excess of $1 billion in China and Brazil. The offshore activities for both the contracts will be performed mainly by the newly-built and highly-specialized Saipem FDS 2 vessel, in different periods between 2012 and 2013. In China, Husky Oil China Ltd awarded Saipem the contract […]