Search results for: P-58

211057 results

A list of search results

  • 19 March 2014

    Brazilian state-run oil company Petrobras has announced that its P-58 FPSO began producing oil on Monday, March 17. The floating production storage and offloading unit is moored  in the Parque das Baleias (Whale Park) field in the Campos basin offshore Brazil. The FPSO can process 180,000 barrels of oil daily as well as six million cubic meters […]

  • 25 February 2019
    Infrastructure

    Brazilian oil company Petrobras has spilled oil in the Campos Basin offshore Brazil, after a hose rupture during an oil offloading from the P-58 FPSO.

  • 5 December 2013

    PETROBRAS’ FPSO, the P-58 and the SS-88 TAD drilling support vessel (Tender Assisted Drilling) are on their way to their respective locations in Parque das Baleias and Papa Terra. The P-58 left the Honório Bicalho shipyard in Rio Grande (RS) where it was converted along with 15 modules being integrated to the unit. The platform […]

  • 5 December 2013

    Petrobras announces that the P-58 FPSO production platform and the SS-88 TAD drilling support vessel (Tender Assisted Drilling), strategic projects in the 2013-2017 Business and Management Plan, are on their way to their respective locations in Parque das Baleias and Papa Terra, respectively. Yesterday, 12/04/2013, the P-58 left the Honório Bicalho shipyard in Rio Grande […]

  • 5 December 2013
    Business & Finance

    PETROBRAS’ FPSO, the P-58 and the SS-88 TAD drilling support vessel (Tender Assisted Drilling) are on their way to their respective locations in Parque das Baleias and Papa Terra. The P-58 left the Honório Bicalho shipyard in Rio Grande (RS) where it was converted along with 15 modules being integrated to the unit. The platform […]

  • 18 April 2014
    Project & Tenders

    Petrobras today announced it has achieved a new production record at its pre-salt province in the Campos and Santos basins, offshore Brazil. According to a statement by the Brazilian oil company, the level of oil output has reached 428 thousand barrels per day (bpd) , which sets a new daily production record. This record production resulted […]

  • 5 December 2013
    Business & Finance, Operations & Maintenance

    Petrobras announces that the P-58 FPSO production platform and the SS-88 TAD drilling support vessel (Tender Assisted Drilling), strategic projects in the 2013-2017 Business and Management Plan, are on their way to their respective locations in Parque das Baleias and Papa Terra, respectively. Yesterday, the P-58 left the Honório Bicalho shipyard in Rio Grande (RS) […]

  • 19 March 2014
    Business & Finance, Operations & Maintenance

    Petrobras announces that the production platform P-58 started-up operation in the complex known as Parque das Baleias, off the coast of Espírito Santo state in Campos Basin, in line with the company’s 2014-2018 Business and Management Plan, through the well 7-BFR-7-ESS, a pre-salt reservoir producer, with an excellent productivity, as expected. P-58 is part of […]

  • 4 February 2013
    Business & Finance

    The P-58 and P-63 oil and gas platforms under construction at Brazilian Honorio Bicalho shipyard collided on Saturday after high winds disentangled their moorings. According to Reuters, Brazil’s state oil company Petrobras said that the platforms broke free of their moorings in port of Rio Grande, and the company is preparing to undertake an inspection […]

  • 16 August 2017

    Brazilian oil giant Petrobras has reported a drop in pre-salt production in July due to a scheduled stoppage on the P-58 FPSO. The state-owned company reported on Tuesday that its total oil and natural gas production in July was 2.74 million barrels of oil equivalent per day (boed), of which 2.63 million boed produced in […]

  • 16 July 2010

    GE will supply gas turbine and compressor equipment to PNBV—Petrobras Netherlands BV, subsidiary of Petrobras the integrated oil and gas company, for deployment in two floating production, storage and offloading (FPSO P-58 and P-62) units for exploration and production offshore Brazil.

  • 26 May 2011
    Business & Finance

    Aker Solutions has won two similar contracts, together worth approx. 120 million NOK(USD 21.6 mln), from CQG Oil & Gas Contractors Inc. and CCI Oil & Gas Contractors Inc., for the supply of Pusnes offloading systems(TM) to two FPSOs in the Brazilian market. The offloading systems will be installed on the two FPSOs P-58 and […]

  • 26 May 2011
    Business & Finance, Equipment

      Aker Solutions has won two similar contracts, together worth approx. 120 million NOK, from CQG Oil & Gas Contractors Inc. and CCI Oil & Gas Contractors Inc., for the supply of Pusnes offloading systems(TM) to two FPSOs in the Brazilian market. The offloading systems will be installed on the two FPSOs P-58 and P-62, […]

  • 25 November 2009

    Keppel Offshore & Marine Ltd (Keppel O&M), through Keppel Shipyard Limited (Keppel Shipyard) and Keppel Verolme BV (Keppel Verolme), has secured two contracts worth a total of about $165 million. The first project, secured by Keppel Shipyard from repeat customer Petrobras Netherlands B.V (PNBV), is for the pre-conversion of P-58, a Floating Production Storage and […]

  • 29 April 2014
    Business & Finance

    Petrobras, a Brazilian oil company, in a race to become one of the five largest oil producers in the world by 2030, has last year reached the unprecedented mark of nine platforms delivered, which will add a million barrels per day to their production capacity. The Company presents the information about these nine platforms completed […]

  • 4 February 2013

    Two Petrobras’ FPSOs have collided in a shipyard in southern Brazil, after their moorings were dislodged by severe wind on Saturday, Reuters reports. According to the news agency, Petrobras said it would launch an investigation to assess the level of damage to the floating production storage and offloading units P-58 and P-63. The incident occurred […]

  • 31 May 2012

    The Philippine Ports Authority is undertaking engineering projects worth P86 million to improve its various terminal management offices in Negros Occidental. According to The Philippine Information Agency, the renovation of Bacolod Terminal Office costs P58.58 million. Fetsy Diamante, the PPA Resource Division Manager said: “This includes a P16.9 million renovation of an old building to […]

  • 22 November 2010
    Business & Finance, Equipment

    Aker Solutions has won two contracts for the supply of mooring and loading systems in Brazil. The contracts have a combined value of approximately NOK 210 million(USD35 Million. “The contracts are strategically important for Aker Solutions based on the potential for future business in Brazil. Aker Solutions is targeting the Brazilian market with a wide […]

  • 6 May 2014

    Petrobras’ March total oil and natural gas production in Brazil was 2,331 million barrels of oil equivalent per day (boed), up by 0.2% from February’s production of 2,327 million boed. Including the production operated by Petrobras for its partners in Brazil, the volume reached 2,483 million boed, indicating a 0.3% rise compared to a month […]

  • 18 September 2014

    Talks are still underway between the US and the Philippines on compensation for damages inflicted by grounding of the USS Guardian, the Phillippine Department of Foreign Affairs said Tuesday. The US Navy minesweeper USS Guardian (MCM 5) ran aground on Tubbataha Reef Jan. 17, while transiting the Sulu Sea. Damages caused by the grounding are estimated […]

  • 14 July 2010
    Business & Finance

    GE  will supply gas turbine and compressor equipment to PNBV—Petrobras Netherlands BV, subsidiary of Petrobras the integrated oil and gas company, for deployment in two floating production, storage and offloading (FPSO P-58 and P-62) units for exploration and production offshore Brazil. The $160 million double FPSO unit contract awarded to GE is a significant assignment […]

  • 18 May 2017
    Infrastructure, Project & Tenders

    Brazilian oil company Petrobras has started oil and natural gas production in the area of Lula Sul (South), at the Santos Basin pre-salt, through FPSO P-66. The FPSO unit left the shipyard and headed to its offshore location in February and, following arrival and hook up, production started on Wednesday, May 17. Lula field is operated by […]