Search results for: Papa Terra

4735 results

A list of search results

  • 12 November 2013
    Business & Finance, Operations & Maintenance

    Chevron Corporation confirmed that its Brazilian subsidiary and Petrobras have started crude oil production from Papa-Terra’s floating production, storage and offloading vessel (FPSO) offshore Brazil. “The startup of Papa-Terra is another important step toward meeting the growth target we’ve set for 2017,” said George Kirkland, Chevron’s vice chairman and executive vice president, Upstream. “The successful […]

  • 12 November 2013

    Chevron Corporation confirmed today that its Brazilian subsidiary and Petrobras have started crude oil production from Papa-Terra’s floating production, storage and offloading vessel (FPSO) offshore Brazil. “The startup of Papa-Terra is another important step toward meeting the growth target we’ve set for 2017,” said George Kirkland, Chevron’s vice chairman and executive vice president, Upstream. “The […]

  • 8 July 2014
    Business & Finance

    The first cargo has been successfully offloaded from what is expected to be Chevron’s largest investment in Brazil: the offshore Papa-Terra heavy oil development in the Campos Basin.

  • 8 July 2014
    Business & Finance

    Chevron’s Papa-Terra Field development situated in the Campos Basin offshore Brasil has marked an important milestone with its first successful offload.   The Brasil Voyager tanker was loaded with close to 740,000 barrels of oil from the floating production, storage and offloading vessel (FPSO) at Papa-Terra, on May 9th, according to Chevron. The first offloaded […]

  • 21 June 2013

    QGOG Constellation S.A.  today announces that Queiroz Galvão Óleo e Gás S.A. (“QGOG”), together with BW Offshore do Brasil Ltda., began providing operational services to the PAPA TERRA FPSO (P-63) on June 18, 2013. The unit is owned by Papa-Terra BV and was built by a joint venture formed by QUIP and BW Offshore. The […]

  • 21 October 2010
    Business & Finance

    Technip has been awarded by Papa Terra BV(1) a contract for the supply of Integrated Production Bundles (IPB(2)) for the Papa-Terra field. This field is located at a water depth of 1,200 meters in the Campos Basin, approximately 110 kilometers offshore Brazil. The contract includes the engineering, procurement, manufacturing and supply of 27 kilometers of […]

  • 20 November 2012
    Business & Finance

    The EPC conversion project FPSO P-63 (Papa Terra) has today left the COSCO Dalian yard in China for its voyage to Brazil with a planned short stop-over in Singapore for refueling. Estimated arrival in Brazil is in February 2013, where the final integration of the remaining six modules will take place in QUIP’s Rio Grande […]

  • 21 June 2013
    Business & Finance, Project & Tenders

    QGOG Constellation S.A. (“QGOG Constellation”) announces that Queiroz Galvão Óleo e Gás S.A. (“QGOG”), together with BW Offshore do Brasil Ltda., began providing operational services to the PAPA TERRA FPSO (P-63) on June 18, 2013. The unit is owned by Papa-Terra BV and was built by a joint venture formed by QUIP and BW Offshore. […]

  • 20 November 2012

    The EPC conversion project FPSO P-63 (Papa Terra) has today left the COSCO Dalian yard in China for its voyage to Brazil with a planned short stop-over in Singapore for refueling. Estimated arrival in Brazil is in February 2013, where the final integration of the remaining six modules will take place in QUIP’s Rio Grande […]

  • 20 November 2012
    Business & Finance, Operations & Maintenance

    The EPC conversion project FPSO P-63 (Papa Terra) has left the COSCO Dalian yard in China for its voyage to Brazil with a planned short stop-over in Singapore for refueling. Estimated arrival in Brazil is in February 2013, where the final integration of the remaining six modules will take place in QUIP’s Rio Grande yard. […]

  • 20 November 2012

    The EPC conversion project FPSO P-63 (Papa Terra) has today, Nov. 20, left the COSCO Dalian Shipyard in China for its voyage to Brazil with a planned short stop-over in Singapore for refueling. Estimated arrival in Brazil is in February 2013, where the final integration of the remaining six modules will take place in QUIP’s […]

  • 21 October 2010

    Technip has booked a new deal with Petrobras for development of another deepwater field in the Campos Basin offshore Brazil. Integrated pipeline bundles totalling 27 kilometres (16.8 miles) in length are to be supplied by Technip for the Papa Terra heavy oil field development in a water depth of 1,200 metres (4,000 ft), along with […]

  • 3 January 2014

    P-61 has been completed and is on its way to the Papa-Terra field, the unit left BrasFels shipyard in the Angra dos Reis bay (RJ), on Dec 31, where the unit was built and assembled. The unit will make a technical stop for diesel and water near Ilha Grande and continue on until its final location, […]

  • 5 December 2013

    Petrobras announces that the P-58 FPSO production platform and the SS-88 TAD drilling support vessel (Tender Assisted Drilling), strategic projects in the 2013-2017 Business and Management Plan, are on their way to their respective locations in Parque das Baleias and Papa Terra, respectively. Yesterday, 12/04/2013, the P-58 left the Honório Bicalho shipyard in Rio Grande […]

  • 17 March 2015
    Exploration & Production, Project & Tenders

    Petrobras has announced the start-up of platform P-61 in Papa Terra field, in the southern tip of Campos Basin, 110 km off the coast of Brazil and at a water depth (distance between water surface and sea floor) ranging from 400 to 1,400 meters. Set up at a water depth of 1,200 meters, platform P-61 […]

  • 5 December 2013
    Business & Finance, Operations & Maintenance

    Petrobras announces that the P-58 FPSO production platform and the SS-88 TAD drilling support vessel (Tender Assisted Drilling), strategic projects in the 2013-2017 Business and Management Plan, are on their way to their respective locations in Parque das Baleias and Papa Terra, respectively. Yesterday, the P-58 left the Honório Bicalho shipyard in Rio Grande (RS) […]

  • 3 January 2014
    Business & Finance

    On Tuesday December 31, 2013 the P-61 left the BrasFels shipyard in the Angra dos Reis bay (RJ) where the unit was built and assembled. The unit will make a technical stop for diesel and water near Ilha Grande and continue on until its final location, the Papa-Terra field in the Campos Basin. The journey […]

  • 3 January 2014

    Petrobras has informed that the P-61 platform has been completed and has left Angra for Papa-Terra field. Tuesday, 12/31/2013, the P-61 left the BrasFels shipyard in the Angra dos Reis bay (RJ) where the unit was built and assembled. The unit will make a technical stop for diesel and water near Ilha Grande and continue […]

  • 4 February 2020

    Petrobras has started the opportunity disclosure stage for the sale of its entire stake of the Papa-Terra field, located in the Campos Basin, and for the sale of part of its interest in exploratory blocks located in the Pará-Maranhão Basin, off Brazil. 

  • 17 March 2015
    Operations & Maintenance

    Petrobras has started production on platform P-61 in Papa Terra field, located near the southern perimeter of the Campos Basin (State of Rio de Janeiro), 110 km off the coast of Brazil and with a water column of 400 to 1,400 m. Moored in waters 1,200 m deep, the P-61 completes the production system for  […]

  • 13 August 2010

    Seadrill and Odfjell are competing for a Petrobras deal. Petrobras is considering offers for the drilling capacity at the Papa Terra field offshore Brazil, which were delivered this week. Aban Offshore has already bagged a five year deal for Aban Abraham, but many companies are competing for a similar deal, says Upstream according to TDN […]

  • 19 July 2012
    Business & Finance

    The EPC conversion project P-63 (Papa Terra) is under construction at the COSCO Dalian yard in China. As a consequence of increased work scope compared with initial plans, the departure of the unit has been delayed. A thorough review of the consequences of the extended yard stay and additional scope has resulted in a revision […]