Search results for: Prirazlomnaya

51 results

A list of search results

  • 26 January 2015
    Equipment, Exploration & Production

    JSC “Belfreight” will supply the Gazprom-operated drilling platform “Prirazlomnaya” with reusable offshore containers, the company has said in a press release. Specialized offshore containers of diverse modification are used to deliver equipment and provision to offshore drilling rig. According to Belfreight its containers, all built in Russia, are highly durable and robust, ensuring their safe transshipment from a […]

  • 8 June 2017

    This is not the first time a football reference has been made on Offshore Energy Today. We’ve had our fair share of Zinedine Zidane photos used to illustrate the articles about a namesake Norwegian offshore oil field. However, we just had to share this one. A football match on one of the world’s northernmost offshore […]

  • 4 October 2013

      A further 15 Greenpeace International activists and a Russian freelance photographer were today charged with piracy in Murmansk, over a protest against Gazprom’s Arctic offshore drilling plans.  This means that all 28 activists from the Greenpeace ship Arctic Sunrise, as well as two freelancers, now face the charge. If convicted, the offence carries a maximum […]

  • 18 April 2014

    Russian president Vladimir Putin today witnessed first oil from the Prirazlomnoye field, in the Pechora Sea, being loaded onto a tanker.   Putin observed via video linkup the start of operations to unload the first supplies of oil extracted from the Arctic continental shelf in the Pechora Sea from the stationary ice-resistant offshore oil platform Prirazlomnaya […]

  • 2 October 2013

    Greenpeace has informed that five activists have been officially charged with piracy in Russia, over a protest against Gazprom’s Arctic offshore drilling plans. The Greenpeace members charged with piracy are Russian activist Roman Dolgov, Finnish activist Sini Saarela, and Swedish/American activist Dima Litvinov, Ana Paula Alminhana Maciel from Brazil and freelance videographer Kieron Bryan from UK. Piracy […]

  • 24 August 2012

    After Greenpeace today announced its activists had climbed aboard the Prirazlomnaya platform in the Pechora Sea offshore Russia, Offshore Energy Today asked Gazprom for a comment. Gazprom’s Information Directorate has replied that: “Today Greenpeace representatives broke the 500-meter safety zone navigation offshore platform Prirazlomnaya and with the help of climbing equipment “hung” by its board. […]

  • 18 September 2013

    Two Greenpeace International activists have been arrested after climbing the Gazprom oil rig Prirazlomnaya, in the remote Pechora sea, in the Russian Arctic, during a peaceful protest that has prompted “a disproportionate use of force by the Russian Coast Guard,” Greenpeace has announced. There are now no climbers remaining on the platform, but the Greenpeace International icebreaker Arctic […]

  • 18 April 2014
    Project & Tenders

    Russian President Vladimir Putin will have a conference call with Chairman of the Gazprom Management Committee Alexei Miller, who is at the Prirazlomnaya offshore ice-resistant stationary platform. The platform is located on the Pechora Sea shelf 60 kilometres off the shore (at the Prirazlomnoye oilfield) and is designed to operate in extreme natural and weather […]

  • 30 September 2013

    Russian authorities have arrested eight more Greenpeace activists. A total of thirty people have now been arrested, after two Greenpeace members climbed a Gazprom-operated offshore platform in the Pechora Sea earlier this month. The activists will, according to information provided by Greenpeace, be detained for two months, pending a piracy investigation. The organization’s Arctic Sunrise ship […]

  • 23 December 2013

    “Gazprom” has started oil production from its  Prirazlomnoye  field. The Prirazlomnoye field was discovered in 1989. It is located on the Pechora Sea shelf 60 kilometers off the shore at the water depth of 19 to 20 meters. Built by Sevmash Production Association, the Prirazlomnaya offshore ice-resistant oil-producing platform is a key pre-development facility. The platform will ensure well drilling, oil production, storage and offloading. The main features are its […]

  • 10 April 2019
    Exploration & Production

    Gazprom’s Arctic offshore platform Prirazlomnaya in the Pechora Sea has shipped its 10 millionth tonne of oil.

  • 23 November 2016
    Business & Finance

    Russian shipping company Sovcomflot and the country’s bank Sberbank signed a memorandum of understanding (MOU) paving the way for a new USD 180 million long-term credit agreement to finance two Panamax Arctic shuttle tankers. With a term of up to 15 years, the credit facility agreement will finance Sovcomflot’s 2010-built tankers Mikhail Ulyanov and Kirill Lavrov, constructed at the […]

  • 27 August 2012
    Business & Finance

    Greenpeace activists have intercepted a vessel carrying workers to the Gazprom-operated Prirazlomnaya platform in Pechora Sea, offshore Russia, Greenpeace has reported. The activists’ boat is now attached to the anchor chain of the Anna Akhmatova vessel, preventing the ship from lifting anchor and sailing to the platform. Greenpeace statement says that the vessel “is not […]

  • 30 January 2017
    Project & Tenders

    Gazprom Neft, an oil producing subsidiary of Russia’s Gazprom, has met its annual production targets at the Prirazlomnaya offshore platform with a total 2,154,000 tonnes of Arctic oil being produced at the offshore field in 2016. According to the company, the produced amount of oil is over two and a half times more than the volumes produced in 2015, […]

  • 24 August 2012

    Greenpeace activists have climbed aboard Gazprom-operated Prirazlomnaya offshore ice-resistant stationary platform at Prirazlomnoye field in the Pechora Sea, offshore Russia. The 6 activists from Germany, Finland, USA, Canada, Germany and South Africa are now anchored in place to the Arctic drilling platform protesting against Arctic drilling. Among them, Greenpeace’s Executive Director Kumi Naidoo. According to […]

  • 29 August 2011
    Business & Finance, Project & Tenders

    Today the Prirazlomnaya offshore ice-resistant stationary platform has been delivered to the Prirazlomnoye field in the Pechora Sea. Experts are to fix the platform on the seafloor at a previously prepared site. Afterwards, they will start to surface the platform perimeter with crushed rock and granite fraction. This is required for preventing the soil erosion […]

  • 21 August 2015
    Exploration & Production, Project & Tenders

    Gazprom Neft has brought its second well into production at the Prirazlomnoye field, with output totalling 1,800 tonnes per day. The Prirazlomnoye project is the first ever upstream project on the Russian Arctic Shelf, Commercial production started in December 2013.   The launch of the new well will see production increase more than two-fold in comparison […]

  • 30 March 2017
    Exploration & Production

    Russia’s largest privately-held oil company Lukoil and Gazprom Neft have conducted a joint exercise “Arctic-2017” to simulate oil spill response in ice conditions in the Arkhangelsk region. Lukoil said on Tuesday that the exercise took place in the Barents Sea, near the Varandey fixed offloading terminal and the Prirazlomnaya platform. The exercise was initiated by […]

  • 29 August 2011
    Business & Finance

    Yesterday the Prirazlomnaya offshore ice-resistant stationary platform has been delivered to the Prirazlomnoye field in the Pechora Sea. Experts are to fix the platform on the seafloor at a previously prepared site. Afterwards, they will start to surface the platform perimeter with crushed rock and granite fraction. This is required for preventing the soil erosion […]

  • 10 August 2011
    Business & Finance

    Yesterday in Murmansk a group of Gazprom’s experts led by Alexander Ananenkov, Deputy Chairman of the Company’s Management Committee visited an affiliate of the Zvezdochka Shiprepairing Center to inspect the Prirazlomnaya offshore ice-resistant stationary platform. The delegation was joined by Roman Trotsenko, President of the United Shipbuilding Company, Nikolai Kalistratov, Director General of the Sevmash […]

  • 20 August 2009

    Cargotec has secured an order for six of its MacGregor knuckle-jib crane units from STX Europe. The cranes are specifically designed to operate in severe climatic conditions and extreme air temperatures and will be installed on three icebreaker tugs, designed by Aker Arctic Technology Inc. The units are scheduled for delivery throughout the period between […]

  • 4 October 2011

    Sevmash became one of participants of the seventh international exhibition «SevTAK-2011», which finished today at Murmansk. Main goal of the exhibition is to help development of fuel-energetic complex, marketing, industry and energetic sphere of Euro-Arctic region of Russia. The exhibition was organized by support of Administration of Murmansk region, Russian and Murmansk unions of manufacturers […]