Search results for: Stimulation

5260 results

A list of search results

  • 13 September 2012
    Business & Finance

    On Friday 7 September, the covenant ‘Partners for International Business Water and Soil Canada’ was signed by a number of Dutch companies and research institutes including Deltares. The aim of this covenant is to stimulate the export of Dutch know-how, products and services in the field of soil decontamination, underground water management and water quality […]

  • 31 October 2011

    LNG Energy Ltd. announced that hydraulic stimulations were performed on both the Cambrian and Ordovician intervals in the Lebork S-1 well following LNG’s Performanced Based Reservoir Characterization Plan. The stimulations and subsequent flowback resulted in gas being flared from each interval, although only a small percentage of the designed proppant quantity and concentration was placed. Approximately […]

  • 20 September 2013

    On September 19 during the annual R&D seminar, MARIN launched a new initiative to help clients with concept tests in the MARIN Concept Basin (CB). Each year MARIN offers six free basin slots of two weeks (80 basin hours including 1 qualified test engineer) to (MKB) clients. This initiative is launched to stimulate innovation in […]

  • 9 November 2010

    Metgasco is pleased to advise that the trial stimulation program for Kingfisher E01 is in progress. Stimulation of the target sandstone interval at 1450 metres, in the Gatton sandstone, was completed on 5th November 2010. The well has been cleaning up over the weekend in preparation for flow testing. The reservoir has responded to the […]

  • 17 June 2015

    Millennium Stimulation Services said that it has been successfully awarded two patents by the United States Patent and Trademark Office for the use of Energized Natural Gas to perform well fracturing operations.

  • 27 April 2012

    Beach Energy announced that a single stage fracture stimulation of the Patchawarra Formation in the Encounter-1 shale and basin centred gas well was successfully placed on 23 April 2012. As with all wells post-stimulation, the Encounter-1 well initially recovered some of the injected fracture stimulation fluid. The well has now commenced flowing gas and the […]

  • 25 February 2015

    Millennium Stimulation Services said that it has been awarded three patents by the Canadian Intellectual Property office for the use of Energized Natural Gas to perform well fracturing operations.

  • 30 October 2019
    Equipment

    Oil company Aker BP, oilfield services provider Schlumberger, and Stimwell Services have established a well intervention and stimulation alliance to accelerate and boost oil production.

  • 14 June 2011

      Beach Energy Ltd announced that the flow stimulation of Holdfast-1 commenced over the weekend. This is the first time flow stimulation has specifically targeted shale target zones at depth in the Cooper Basin, with the flow stimulation of Holdfast-1 to be undertaken in eight stages. It is expected that the stimulation process will be […]

  • 20 January 2010

    The bunkering of gas oil rose last year in Rotterdam by about 20%, from 252,414 tonnes to 302,607 tonnes. At the end of 2009, sales of this light oil increased considerably due to new environmental regulations issued by the European Union. Ocean-going vessels which berth for more than two hours must use fuel with a […]

  • 30 April 2014
    Business & Finance

     Island Offshore, a Norway-based owner of offshore support vessels, informed that its well stimulation vessel Island Commander has been awarded a contract extension from ConocoPhillips for a period of one year. This means that the vessel will be on a firm contract until June 2015, with further options until 2018. Island Commander was delivered from Vard […]

  • 8 June 2011

      Beach Energy Limited has rigged up on site, conducted mechanical checks and is ready to commence stimulation of the target zone in its PEL 218 Holdfast-1 shale gas well. The flow stimulation of Holdfast-1 will be undertaken in eight stages and is expected to be completed within two weeks, with the first flow results […]

  • 27 May 2013

    Beach Energy Ltd announced the details in relation to its deep onshore gas exploration program, both in PEL 218 (Beach 70%, Chevron Australia Exploration 1 Pty Ltd 30%) and ATP 855 (Beach 42% and operator, Chevron 18%, Icon Energy Ltd 40%). PEL 218 Boston-2 The Boston-2 vertical well, located 320 metres south east of the […]

  • 30 July 2014

    Icon Energy said that the ATP 855 Joint Venture has reached an agreement on the forthcoming hydraulic stimulation and testing program to be undertaken by Condor Energy Services due to commence in early September 2014. Condor’s hydraulic stimulation equipment arrived in Melbourne on 26 July 2014. Following clearance in Melbourne and testing in Adelaide, the equipment will be transported […]

  • 19 May 2011

    Beach Energy Ltd will commence flow stimulation of its Holdfast-1 shale well in early June, which will be followed immediately by the flow stimulation of the Encounter-1 shale well. In preparation for flow stimulation, the Holdfast-1 well has been successfully completed with Encounter-1 completion expected to be finalised within the next week. The flow stimulation […]

  • 13 October 2014

    Icon Energy said that the ATP 855 Joint Venture has completed the Hydraulic Stimulation program at Hervey-1. The flow testing of Hervey -1 will be conducted over the coming weeks and more information will be announced upon a stabilised flow rate from the well. Condor Energy Services has now moved the hydraulic stimulation equipment to […]

  • 25 December 2018

    BP, as the operator of the Azer-Chirag-Gunashli field development project in the Azerbaijani sector of the Caspian Sea, has launched a newly retro-fitted vessel to be used for acid stimulation activities in selected 17 ACG wells. 

  • 29 October 2012

    Beach Energy announced it has commenced hydraulic fracture stimulation of the Moonta-1 unconventional shale and basin centred gas exploration well, located in PEL 218 (Beach 100%) in the Nappamerri Trough in the Cooper Basin. The Moonta-1 well was drilled in April 2012 to a depth of 3,810 metres, with logs indicating the well has in […]

  • 11 December 2014
    Project & Tenders

    Gaz Métro and Fluxys agreed to collaborate on stimulating LNG and CNG markets for industry and transportation sector.

  • 3 May 2013
    Equipment

    Caterpillar Global Petroleum is pleased to announce the launch of Cat® Well Stimulation Pumps for the well service market. Starting in May 2013, Caterpillar will begin accepting orders for the Cat WS223, a 2250 bhp (1678 bkW) triplex well stimulation pump, as well as the Cat WS255, a 2500 bhp (1864 bkW) quintuplex well stimulation […]

  • 26 November 2015
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Airborne Oil & Gas has been awarded contract by a West African operator for the supply of a composite downline, jumpers and deployment system for acid stimulation. Airborne Oil and Gas’s Thermoplastic Composite Pipe (TCP) technology was selected as the preferred solution for injecting large volumes of stimulation fluids offshore in deep water offshore West […]

  • 20 January 2014

    Beach Energy announced update in relation to the unconventional exploration program in the South Australian Cooper Basin Joint Venture and the Nappamerri Trough Natural Gas project in PEL 218 and ATP 855.  SACB JV Unconventional Gas REM The REM exploration program is focused on the Roseneath Shale, Epsilon Formation, Murteree Shale and Patchawarra Formation. This program is being undertaken […]