Search results for: Triton FPSO

7857 results

A list of search results

  • 10 December 2018
    Infrastructure, Project & Tenders

    Tailwind Energy has announced first oil from its 100% owned Gannet E redevelopment to the Triton FPSO located offshore the UK. 

  • 21 December 2017
    Business & Finance, Infrastructure

    Tailwind Energy has signed an agreement with Shell and ExxonMobil to acquire their interests in the Triton Cluster, which Tailwind intends to further develop. The Triton Cluster, located in the UK Central North Sea 190km east of Aberdeen, was initially brought into production in 2000. Tailwind said in a statement on Thursday that the deal […]

  • 10 March 2020
    Infrastructure, Project & Tenders

    Tailwind Energy has filed an environmental statement for its Evelyn development, located in the UK North Sea, to the UK authorities. 

  • 31 March 2017
    Infrastructure

    UK operator Dana Petroleum has detected a gas leak at its offshore unit in the North Sea. In a email sent to Offshore Energy Today on Friday, Dana said production was partially shut in on the Triton FPSO following identification of a gas leak on subsea gas lift infrastructure. According to BBC, the leak was […]

  • 6 July 2012

    John Mills Valves, a subsidiary of Wärtsilä Valves Limited, has completed a contract for a bronze globe valve for GE Oil & Gas for the firefighting system handling seawater on the Triton FPSO facility, approximately 100 miles off the east coast of Scotland. GE Oil & Gas required a non-standard valve with alternative flanging and […]

  • 3 September 2018

    Tailwind Energy has completed the acquisition of interests in the Triton Cluster located in the UK North Sea from Shell and ExxonMobil. 

  • 6 July 2012
    Business & Finance

    John Mills Valves, a subsidiary of Wärtsilä Valves Limited, has completed a contract for a bronze globe valve for GE Oil & Gas for the firefighting system handling seawater on the Triton FPSO facility, approximately 100 miles off the east coast of Scotland. GE Oil & Gas required a non-standard valve with alternative flanging and […]

  • 22 January 2020
    Business & Finance, Operations & Maintenance, Project & Tenders

    Ocean Installer has won a contract from Dana Petroleum for work at the Triton Area Development in the Central North Sea some 190 kilometers east of Aberdeen. The contract, which is Ocean Installer’s first with Dana, involves the installation and trenching of a 12-inch flexible production flowline at the Guillemot field. The project will be […]

  • 14 April 2015
    Business & Finance, Equipment

    Technip has been awarded a brownfield subsea contract for the Triton floating production storage and offloading (FPSO) vessel, operated by Dana Petroleum, located in the central North Sea. This FPSO vessel is located 193 kilometers east of Aberdeen, at a water depth of approximately 90 meters. It produces oil and gas from different fields – […]

  • 1 October 2012
    Business & Finance

    Today, Dana Petroleum (E&P) Limited, a wholly owned subsidiary of Dana Petroleum plc (Dana) takes over the operatorship of the Triton floating production storage and offloading vessel (FPSO) from Hess and Dana acquires Hess’ 28.28% stake in the Bittern field, increasing Dana’s share in the field to 33%. Paul Griffin, Dana’s UK Managing Director, said, […]

  • 3 December 2013

    A small fire occurred yesterday on board a Dana Petroleum-operated FPSO, moored in the UK North Sea.   In an e-mail sent to Offshore Energy Today, Dana Petroleum confirmed that there was a minor incident on its Triton Floating, Production, Storage and Offloading vessel (FPSO) in the UK North Sea Monday. “Smoke and sparks were seen […]

  • 1 October 2012
    Business & Finance

    Today Dana Petroleum (E&P) Limited, a wholly owned subsidiary of Dana Petroleum plc (Dana) takes over the operatorship of the Triton floating production storage and offloading vessel (FPSO) from Hess and Dana acquires Hess’ 28.28% stake in the Bittern field, increasing Dana’s share in the field to 33%. Paul Griffin, Dana’s UK Managing Director, said, […]

  • 1 October 2012
    Business & Finance

    Today, (Monday 1 October 2012), Dana Petroleum (E&P) Limited, a wholly owned subsidiary of Dana Petroleum plc (Dana) takes over the operatorship of the Triton floating production storage and offloading vessel (FPSO) from Hess and Dana acquires Hess’ 28.28% stake in the Bittern field, increasing Dana’s share in the field to 33%. Paul Griffin, Dana’s […]

  • 22 April 2019
    Business & Finance, Infrastructure

    DNV GL has secured a three-year contract across the Dana Petroleum operated assets on the United Kingdom Continental Shelf.

  • 31 July 2013
    Business & Finance

    Dana Petroleum has replaced all nine mooring chains on its oil production vessel Triton – under budget and ahead of schedule. The project was commissioned to maintain the safety of Dana’s offshore teams and the integrity of the floating, production, storage and offloading vessel (FPSO). The replacement will support Triton’s safe operation well into the […]

  • 31 July 2013
    Equipment

    Dana Petroleum has replaced all nine mooring chains on its oil production vessel Triton – under budget and ahead of schedule.

  • 22 January 2020
    Business & Finance

    Dana Petroleum has awarded Ocean Installer a contract for work at the Triton Area Development, located in the Central North Sea around 190 km east of Aberdeen.

  • 23 February 2012
    Business & Finance

    Dana Petroleum plc (‘Dana’), a subsidiary of Korea’s KNOChas reached an agreement with Hess Corporation  to acquire Hess’ 28.3% interest in the Bittern field, increasing Dana’s share to 33%. As a result of the transaction Hess will resign the affiliated operatorship of the Triton floating production, storage and offloading (FPSO) vessel and Dana has indicated […]

  • 31 July 2013
    Business & Finance, Equipment

    Dana Petroleum has replaced all nine mooring chains on its oil production vessel Triton – under budget and ahead of schedule. The project was commissioned to maintain the safety of Dana’s offshore teams and the integrity of the floating, production, storage and offloading vessel (FPSO). The replacement will support Triton’s safe operation well into the […]

  • 6 August 2013
    Business & Finance

    Wood Group PSN (WGPSN) has retained its contract with Dana Petroleum for integrated support services (ISC) in the North Sea, marking more than 14 years of continuous service as prime contractor on the Triton FPSO. The contract is for two years with the option of a one-year extension and estimated to be worth up to […]

  • 19 July 2013
    Business & Finance

    Dana Petroleum’s oil production vessel Triton has marked a major milestone by successfully extracting its 200 millionth barrel from the North Sea. Triton is a floating, production, storage and offloading vessel (FPSO) and produces oil and gas from the Bittern, Guillemot West and North West, Clapham, Pict and Saxon fields. It is located in the […]

  • 6 August 2013
    Business & Finance, Operations & Maintenance, Project & Tenders

    Wood Group PSN (WGPSN) has retained its contract with Dana Petroleum for integrated support services (ISC) in the North Sea, marking more than 14 years of continuous service as prime contractor on the Triton FPSO. The contract is for two years with the option of a one-year extension and estimated to be worth up to […]