Search results for: christmas tree

52260 results

A list of search results

  • 25 November 2014
    Equipment

    Inpex-operated Ichthys LNG project’s christmas tree systems touched ground in Australia.

  • 14 September 2006

    Aker Kvaerner has been awarded a contract to supply subsea trees to Brazil’s national oil company Petrobras. The contract has a value of approximately USD 12 million. The scope of work comprises three mudline dual-bore christmas trees designed to 250 metres (820 feet) water depth, with associated tools. The christmas trees will be deployed in […]

  • 11 April 2007

    Aker Kvaerner has been awarded a contract to supply 18 subsea christmas trees to Brazil’s national oil company Petrobras under the current frame agreement. The contract has a value of approximately USD 50 million. The scope of work comprises 18 dual bore subsea christmas trees, designed to 2 000 metres (6 500 feet) water depth. […]

  • 28 July 2006

    Aker Kvaerner has been awarded a two year frame agreement to supply subsea christmas trees to Brazil’s national oil company Petrobras. The contract has a value of approximately USD 84 million. The scope of work comprises 30 subsea christmas trees with associated tools. First call-off is to comprise 9 dual-bore christmas trees designed to 2000 […]

  • 21 November 2014

    The Inpex-operated Ichthys LNG project’s christmas tree systems have arrived at GE’s Jandakot facility in Western Australia for inspection and testing.

  • 21 November 2014
    Equipment, Project & Tenders

    First christmas tree systems for the INPEX-operated Ichthys LNG project’s have arrived in Australia. The tree systems left the subsea manufacturing facility at Bridge of Don in Aberdeen, Scotland on 3 October and arrived at GE’s Jandakot facility in Western Australia on Friday 21 November 2014. Ichthys Project Managing Director Louis Bon said it had […]

  • 21 November 2014
    Equipment

    The INPEX-operated Ichthys LNG Project’s first christmas tree systems have arrived in Australia. The tree systems left the subsea manufacturing facility at Bridge of Don in Aberdeen, Scotland on 3 October and arrived safely at GE’s Jandakot facility in Western Australia on Friday 21 November 2014. Ichthys Project Managing Director Louis Bon said it had […]

  • 27 July 2015
    Equipment

    Aker Solutions, an oil services company, has delivered the first christmas tree for Petrobras’ FA 2011 60 XMT project. According to Aker Solutions, the christmas tree was delivered to Brazil’s state-owned oil company before the contract deadline. “The great execution is due to good planning from the start of the project, including steps such as […]

  • 13 November 2015

    The Ensco 5006 drilling rig deployed on the Inpex-operated Ichthys LNG project received two 104 tonne christmas trees last month.

  • 27 July 2015
    Equipment

    Aker Solutions in Brazil delivered the first Christmas Tree for Petrobras’ FA 2011 60 XMT project before the contract deadline, the company informed through social media. “The great execution is due to good planning from the start of the project, including steps such as engineering, release of purchasing materials and supplier delivery time and production,” […]

  • 22 January 2015
    Equipment

    Brazil’s Petrobras has informed the company is saving $5 million per well by replacing drillships with technology adapted for pre-salt depths. This technique allows it to cut ocean descent times. At the end of last year, Petrobras deployed its first wet Christmas tree (equipment installed on a wellhead, composed of a set of remotely operated valves […]

  • 22 January 2015
    Operations & Maintenance, Research & Development

    Petrobras deployed its first wet Christmas tree (equipment installed on a wellhead, composed of a set of remotely operated valves designed to control the flow of fluids such as oil, water and natural gas from a reservoir to the surface) using cables in the pre-salt area at the end of last year. The main change […]

  • 18 March 2019
    Business & Finance, Equipment, Research & Development

    Norway’s Petroleum Safety Authority (PSA) has carried out an audit of Equinor and the fabrication of the subsea Christmas tree for the Snorre expansion project. The objective of the audit was to ensure that fabrication of the subsea Christmas tree for the Snorre expansion project complied with the company’s own requirements and requirements in the […]

  • 2 June 2016
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    GE Oil & Gas has been awarded a surface wellhead & christmas tree equipment and services contract by the Norwegian oil and gas company Statoil for its Johan Sverdrup project in the North Sea. With the new multi-year agreement, GE Oil & Gas will manufacture, deliver and install its standardized surface wellhead and christmas tree […]

  • 19 June 2017
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Claxton has been awarded a contract to riglessly casing cut and recover a total of seven wells in the Southern North Sea across two of the operator’s, normally unmanned, platforms, along with an additional subsea suspended well at one of the locations. Work is scheduled to begin in July at the first location, located around 180km […]

  • 13 April 2016

    LNG giant Shell informed that as its Prelude FLNG facility is being built at Samsung Heavy Industries’ Geoje in South Korea, the project’s development has moved to the seabed at the Prelude gas field.

  • 18 September 2012
    Business & Finance, Equipment

    A new concept in skid design from Saab Seaeye adds a powerful tooling capability to their technologically advanced Cougar XTi ROV.  It means that for Christmas tree installation and other work tasks a small electric ROV can be deployed in the support role rather than a large hydraulic work class vehicle. The innovation behind the […]

  • 1 January 2008

    Cameron has been awarded a contract worth more than $190 million to provide subsea equipment and services to Petroleos De Venezuela S. A., the Venezuelan national oil company. Under the contract, which consists of three packages, Cameron will provide ten subsea Christmas trees, wellheads, associated production control systems, in-field jumpers and flowline connection systems, along […]

  • 8 March 2011
    Business & Finance, Equipment

      Cameron has received a contract valued at approximately $200 million from ConocoPhillips to provide equipment and services on two new platforms in the Greater Ekofisk Area Development offshore Norway. The contract is subject to Government approval of the Plan for Development and Operations (PDO) for Ekofisk South and Eldfisk II. The multi-year agreement calls […]

  • 18 September 2012
    Business & Finance, Equipment, Operations & Maintenance, Research & Development

    A new concept in skid design from Saab Seaeye adds a powerful tooling capability to their technologically advanced Cougar XTi ROV. It means that for Christmas tree installation and other work tasks a small electric ROV can be deployed in the support role rather than a large hydraulic work class vehicle. The innovation behind the […]

  • 8 March 2011
    Business & Finance, Operations & Maintenance

      Cameron  has received a contract valued at approximately $200 million from ConocoPhillips to provide equipment and services on two new platforms in the Greater Ekofisk Area Development offshore Norway. The contract is subject to Government approval of the Plan for Development and Operations (PDO) for Ekofisk South and Eldfisk II. The multi-year agreement calls […]

  • 21 January 2011
    Business & Finance, Equipment

    Cameron has received a contract valued at approximately $90 million from Statoil for the provision of high temperature, high pressure (HPHT) surface wellhead and Christmas trees for the Norwegian Gudrun platform with further options for the Valemon and Brynhild platform developments. The seven-year agreement also includes aftermarket services with the option for two-year extensions continuing […]