Search results for: inter-array

82462 results

A list of search results

  • 13 February 2019
    Business & Finance, Project & Tenders

    Royal Boskalis Westminster N.V. has signed a contract for inter-array cable work at an undisclosed offshore wind farm. Under the EUR 80 million contract, the Dutch company is in charge of replacing and repairing a part of the inter-array cables at the project. Boskalis will use three anchored barge spreads, including the cable repair assets Bokabarge 82 and recently acquired […]

  • 9 September 2015
    Storage

     Advanced Global Energy and Dynamo Electrical have formed a new engineering company Inter Array Engineering. Inter Array Engineering will offer a OWF package for clients with services including all of the following, MV/HV/EHV termination and testing, fibre optic services, wind farm management, wind farm consultancy and full training facilities and packages. Both of Inter Arrays […]

  • 6 June 2019
    Storage

    Van Oord has deployed its trencher Dig-It to bury the laid inter-array cables at the Deutsche Bucht offshore wind farm in Germany. The inter-array cables are being buried at the required depth of 1.5m below the seabed at the 269MW project, Van Oord said. The Dutch company reported that its cable laying vessel Nexus installed […]

  • 9 November 2017

    Dutch company Ridderflex has produced and delivered about 180 customised polyurethane hang-offs and plugs to GeoSea, the company now using these tools to connect the inter-array cables to the wind turbines at Belgian Rentel offshore wind farm.

  • 14 September 2015

    By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the wind farm. […]

  • 14 September 2015

    By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the wind farm. […]

  • 5 September 2014
    Business & Finance, Equipment

    JDR will showcase its industry leading inter-array cable designs, cable accessories and post-delivery offshore services at Wind Energy Hamburg. JDR’s engineering team has led the development of inter-array cables for offshore wind operators across a range of important projects including the Meerwind Sud/Ost farm in Northern Germany and the world’s two largest offshore wind farms, Greater […]

  • 17 July 2018

    The cable laying vessel (CLV) Siem Aimery will commence the third inter-array cable installation campaign at the Beatrice offshore wind farm on 17 July, according to the latest Notice to Mariners from the project’s marine coordination team. 

  • 6 July 2020
    Project & Tenders

    Vattenfall has issued a tender seeking a manufacturer of inter-array cables for the Vesterhav Syd and Nord nearshore wind farms in Denmark. The selected party will be in charge of supplying all the required work for the inter-array cable manufacturing for the two wind farms. The contract would start on 6 August 2021 and end […]

  • 21 March 2018

    After installing 16 inter-array cables at the Beatrice offshore wind farm in late 2017, the cable laying vessel Siem Aimery continued the works with the second campaign that started on 10 March.

  • 23 September 2014
    Business & Finance, Storage, Technology

    VBMS has awarded JDR the inter-array cable contract for the Vattenfall AB Sandbank offshore wind farm. JDR will design and manufacture 105 kilometres of inter-array cable, including a new coilable 630mm2 copper core cable and a range of cable accessories. The Sandbank offshore wind farm will be constructed 90km west of Sylt island, within the […]

  • 27 February 2020
    Storage

    The first inter-array cable has been installed at the Borssele 1 & 2 offshore wind project in the Netherlands. Nexans is providing up to 190km of inter-array cable rated at a maximum operating capacity of 72.5kV for the 752MW project, while Van Oord is in charge of the transport and installation. Van Oord is deploying its […]

  • 27 May 2020
    Project & Tenders

    DEME Group has completed inter-array cable laying works at the SeaMade offshore wind farm in Belgium. DEME’s DP3 cable installation vessel Living Stone laid 64 inter-array cables with a total length of 71.2km. According to the company, the vessel operated at peak production levels, laying up to three cables per day. To remind, the inter-array […]

  • 16 August 2018
    Storage

    Boskalis Subsea’s cable laying vessel Stemat Spirit has started laying inter-array cables on the 497MW Hohe See, EnBW, the developer and majority owner of the wind farm in the German North Sea, said.

  • 23 August 2017
    Operations & Maintenance

    VBMS has completed the installation of the inter-array cables for the Galloper offshore wind farm.  VBMS installed the last inter-array cable, out of 56 total, for the offshore wind farm on Tuesday, the company informed through its social media. Cable laying vessel (CLV) Ndurance together with the HD3 plough have simultaneously layed and buried 70 kilometers of cable […]

  • 21 March 2018

    After installing 16 inter-array cables at the Beatrice offshore wind farm in late 2017, the cable laying vessel Siem Aimery continued the works with the second campaign that started on 10 March.

  • 12 May 2020
    Project & Tenders

    Oceaneering International Services Ltd (OISL) is about to start clearing the inter-array cable routes at the Moray East site. According to a Notice of Operations, boulder clearance at the export cable routes should finish on 12 May. Immediately after that, the same work at the inter-array routes is set to commence. Clearing the inter-array cable […]

  • 27 February 2020
    Business & Finance, Equipment, Operations & Maintenance

    Danish developer Ørsted has seen the first inter-array cable set up at its Borssele 1 & 2 offshore wind complex in the Netherlands. Borssele 1 and 2 are located around 23 kilometers off the Dutch coast in 14 to 36 meters of water. The dutch offshore contractor Van Oord is responsible for the transportation, installation […]

  • 17 March 2020

    30 monopile foundations and 14 inter-array cables have so far been installed on the 752MW Borssele 1 + 2 offshore wind farm in the Dutch North Sea, Ørsted. Located some 23 kilometres off the coast of Zeeland, Borssele 1 + 2 will comprise 94 Siemens Gamesa 8MW wind turbines scheduled to be operational by the […]

  • 31 October 2014
    Business & Finance, Storage

    Eolien Maritime France, a subsidiary of EDF EN France and DONG Energy, has invited tenders for the delivery and installation of inter-array grid for Courseulles sur Mer, Fecamp and Saint-Nazaire’s offshore wind farms. The scope concerns the design, engineering, procurement, construction, transport, storage, installation, commissioning, testing and other services for the three wind farms. Divided in three lots, […]

  • 16 August 2018
    Storage

    Boskalis Subsea’s cable laying vessel Stemat Spirit has started laying inter-array cables on the 497MW Hohe See, EnBW, the developer and majority owner of the wind farm in the German North Sea, said.

  • 14 May 2020
    Project & Tenders

    Ørsted has provided an update on the ongoing offshore construction work at the 752 MW Borssele 1 + 2 offshore wind farm in the Dutch North Sea, saying that all activities are going according to plans. So far, DEME’s installation vessel Innovation has installed 73 out of the 94 monopile foundations at the site some […]