Search results for: jacket

3229 results

A list of search results

  • 20 September 2018
    Business & Finance, Equipment, Operations & Maintenance, Research & Development

    The patented iJacket is said to be more structurally optimized than the conventional true X-braced jacket design, supporting the same deck load, conductor/riser count, drilling deck, wind turbine or other payload as its conventional counterpart.

  • 7 October 2016
    Business & Finance, Equipment, Operations & Maintenance

    Four piling cluster and two sets flotation tanks, with a total steel weight of close to 7,000 tons, arrived at Kvaerner’s yard in Verdal from Dubai this week . The structures will be installed on the first and largest steel jacket for the Johan Sverdrup projects, currently under construction at Verdal. This is the first of two […]

  • 19 September 2017
    Technology

    Trelleborg’s engineered products operation has added to its portfolio of offshore floatover solutions with a custom designed skirt pile gripper (SPG).

  • 8 June 2017
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Allspeeds, manufacturer of Webtool hydraulic cutting systems, has supplied 12 softline cutters to Resolve Marine for a decommissioning project offshore Mumbai. For the decommissioning project, the Webtool softline cutters will be used to cut 76mm (3 inch) diameter Dyneema softline rope. The 127mm cutters will be positioned on fibre rope, soft eye slings and activated […]

  • 20 September 2019
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Repsol Norge has awarded Allseas an EPRD contract for the removal, transfer, load-in to shore and disposal of its Gyda platform in the Norwegian North Sea. The contract covers both the 18,000t topsides and 11,200t jacket, and includes an option for reinstallation on another field, which would be an unprecedented step for a fixed installation […]

  • 7 July 2017
    Business & Finance, Equipment, Operations & Maintenance

    Heerema Fabrication Group (HFG) has completed construction of the Culzean jackets for client Maersk Oil North Sea UK Limited. Following the sailaway of the jacket for the central processing facilities platform (CPF) on June 28, the jacket for the utility & living quarter platform (ULQ) set sail on July 7. Final destination the jackets is […]

  • 1 February 2017
    Operations & Maintenance

    Heerema Fabrication Group is pressing on with its operations on two jackets meant for the Culzean field development at its Vlissingen facility in the Netherlands. The company reported through its social media channels on Tuesday, January 31 that the last row of the Culzean’s utility & living quarter (ULQ) jacket was also in upright position. Culzean’s […]

  • 19 January 2012
    Business & Finance, Equipment, Project & Tenders

    Lundin Norway AS has awarded Kvaerner an EPC contract of approximately NOK 1.1 billion for delivery of a steel jacket to be located at the Luno field, production license PL338, offshore the Norwegian North Sea. “Jacket structures are core business for Kvaerner and I am very pleased that we have won this important contract in […]

  • 14 November 2017

    Seaway Heavy Lifting’s (SHL) vessel Oleg Strashnov will return to the Beatrice site on 16 November and will continue installing jacket foundations until mid-December, when it will leave the site once again and SHL’s vessel Stanislav Yudin will take over. 

  • 29 June 2020
    Heavy lifting, Ports & Logistics

    Following the first load-out of the jacket foundations built by Samkang for the TPC Phase 1 wind farm in Taiwan, the South Korean manufacturer has now shared a video showing the process. Back in May, Jan De Nul completed the load-out of the first four of the 21 jacket foundations built for the 109.2 MW […]

  • 16 June 2016
    Equipment, Project & Tenders

    Seaway Heavy Lifting has awarded Bladt Industries an order for 30 jacket foundations for the Beatrice offshore wind farm. Fabrication of the jackets will take place at Bladt’ production facilities at Lindoe Industrial Park, Denmark. Bladt will provide 30 four-legged jacket foundations for the wind farm. The jacket foundations will have a height of up to 71 metres […]

  • 11 July 2018
    Business & Finance, Equipment, Project & Tenders

    Dragados Offshore and Sif Netherlands have signed a contract for the supply of legs, caissons, and piles for the two jackets of the Tyra future development project. Earlier this year, Dragados Offshore won a contract from Mærsk Oil and Gas for the Tyra East G & Tyra East H jackets. Dragados Offshore’s scope of work […]

  • 7 July 2017
    Project & Tenders

    A jacket for the utility & living quarter (ULQ) platform for the Maersk Oil-operated Culzean field is now on its way to the UK sector of the North Sea.  This is the third and final jacket for the High Pressure High Temperature Culzean development. It set sail on Friday, July 7, shortly after the central processing […]

  • 8 July 2016

    Heavy-lifting specialists ALE today reported that it had performed the first load-out of jacket foundations for the Wikinger offshore wind farm. The first jacket, weighing 625t, was loaded-out using self-propelled modular transporters (SPMTs) and a CC8800 crawler crane in Ferrol, Spain. ALE has been contracted to perform a total of 58 land transportations (two per jacket) using SPMTs and […]

  • 31 July 2017
    Business & Finance, Equipment, Operations & Maintenance

    Standing 140 metres tall and weighing 26 000 tonnes, the first jacket for Johan Sverdrup is the largest on the Norwegian Continental Shelf. The steel jacket will carry the riser platform, which is one of four platforms being built in the field’s first development phase. It was built at Kværner’s shipyard in Verdal. Two of […]

  • 13 May 2020
    Ports & Logistics

    Over the past few weeks, Manora Logistics has been transporting upper jacket foundation sections from Spain and Belgium to Newcastle, UK. Given the facts at hand, our sister news site OffshoreWIND.biz inquired about the jacket parts being for the Moray East offshore wind farm. However, Manora Logistics declined to confirm this. Namely, on 12 May, […]

  • 23 June 2017
    Equipment

    Kvaerner has completed and named riser platform (RP) jacket for the Johan Sverdrup development which will be ready for delivery in July. The RP jacket was given the name Aegir at a ceremony held at Kvaerner’s yard at Verdal, the company informed. The jacket is the first major structure for the Johan Sverdrup project to […]

  • 20 September 2019
    Business & Finance

    Repsol Norge has awarded Allseas an EPRD contract for the removal, transfer, load-in to shore and disposal of its Gyda platform in the Norwegian North Sea.

  • 12 July 2017
    Equipment

    The jacket for the central processing facility (CPF) on the Culzean field, located in the British sector of the North Sea, has been installed, Maersk Oil informed. It follows the installation of the wellhead platform jacket  set up in May 2016. The CPF jacket, set sail from Heerema Fabrication Group’s Vlissingen facility on June 28. The deepwater […]

  • 22 February 2018
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Dragados Offshore has won a contract from Mærsk Oil and Gas for the Tyra East G & Tyra East H jackets for the ‘Tyra Future Development Project’, both to be installed in the Danish sector of the North Sea. Dragados Offshore’s scope of work includes project management, HSEQ management, procurement, construction (ePC), preservation, preparation for […]

  • 13 February 2012
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders

    Total E&P Norge AS has awarded Kvaerner an EPSC-contract (Engineering, Procurement, Supply and Construction) of close to NOK 1.2 billion for delivery of a steel jacket to be located at the Hild Field offshore the Norwegian North Sea. “We are very pleased to have won our second jacket this year in tough international competition. This […]

  • 5 June 2013
    Equipment, Project & Tenders

      The Clair Ridge Drilling & Production jacket of 23 000 tonnes – the biggest jacket ever built by the Norwegian Kvaerner yard yesterday left Verdal and is now on tow to its location west of the Shetland Islands. The jacket’s footprint on the seabed is  85 x 68 metres. With the delivery of the […]