Search results for: oin piles

117764 results

A list of search results

  • 11 April 2014
    Business & Finance, Equipment, Operations & Maintenance, Project & Tenders, Research & Development

    The Shah Deniz consortium informed that the Stage 2 project continues to progress on schedule with further major construction and supply contracts recently awarded. The contract for the fabrication of the jackets for the two planned offshore platforms, pin piles and subsea structures has been awarded to the consortium consisting of BOS Shelf LLC, Saipem […]

  • 17 June 2020
    Business developments & projects

    EEW Group is producing the steel pipe components for the 47 jacket foundations to be installed on the Formosa 2 wind farm offshore Taiwan. The production of the steel pipes for the jackets started in January at EEW Korea, EEW KHPC, and EEW Malaysia and is expected to be completed in October 2020. With a […]

  • 15 January 2020
    Business & Finance

    Steel fabricator CSBC Corporation has inaugurated its pin-pile production line at its factory near the Port of Kaohsiung in Taiwan. CSBC also plans to add a line for the production of transition pieces to the facility. The production line will be used to manufacture pin-piles for Ørsted’s Changhua 1 and 2a offshore wind farm. CSBC […]

  • 22 May 2015

    Dominion filed a monthly update report on its Cove Point liquefaction project with Federal Energy Regulatory Commission.

  • 22 May 2015

    Dominion filed a monthly update report on its Cove Point liquefaction project with Federal Energy Regulatory Commission.

  • 12 February 2013

    The United States filed a civil action against ATP Oil & Gas Corporation and ATP Infrastructure Partners, LP (ATP-IP) for civil penalties and injunctive relief under the Clean Water Act and the Outer Continental Shelf Lands Act. The complaint was filed on behalf of the U.S. Department of the Interior’s Bureau of Safety and Environmental […]

  • 24 October 2018
    Project & Tenders

    Ørsted has signed a contract with CSBC Corporation for the manufacture of ”a significant number” of wind turbine foundation pin-piles for the first 900MW Greater Changhua projects in Taiwan.

  • 24 October 2018
    Project & Tenders

    Ørsted has signed a contract with CSBC Corporation for the manufacture of ”a significant number” of wind turbine foundation pin-piles for the first 900MW Greater Changhua projects in Taiwan.

  • 17 December 2010
    Business & Finance

    The amount refers to newly awarded contracts for activities to be carried out between 2011 and 2014, in the Gulf of Mexico, and in Kazakhstan, alongside other works in the North Sea and Azerbaijan. It also includes increases in the scope of work on existing offshore contracts. In the US sector of the Gulf of […]

  • 18 May 2020
    Project & Tenders

    EEW’s manufacturing facilities in Asia have produced half of the total of 188 pin piles for Taiwan’s Formosa 2 offshore wind farm. Formosa 2 will comprise 47 jacket foundations, with each jacket secured to the seabed with four pin piles. Each pile is approximately 65 metres long, has a diameter of 2.4 metres and weighs 240 […]

  • 11 January 2016

    Cameron LNG said it is moving forward with construction works aimed at adding liquefaction and export capability at its terminal under construction in Hackberry, Louisiana. Cameron LNG is a JV owned by Sempra Energy, Engie (GDF Suez), Mitsui & Co. and Japan LNG Investment, a joint venture formed by affiliates of Mitsubishi and Nippon Yusen […]

  • 11 September 2018
    Business & Finance, Equipment

    EEW Special Pipe Constructions GmbH has received an order from HMC for 16 pin piles for the Leviathan project offshore Israel.

  • 19 August 2011

    The U.S. Environmental Protection Agency (EPA) announced that work has begun on removing 200,000 cubic yards of contaminated sediment from an area of the Passaic River near the Diamond Alkali Superfund site located at 80 Lister Avenue in Newark, NJ. EPA and the U.S. Army Corps of Engineers are overseeing the work, which is funded […]

  • 15 April 2014

    All jacket pin piles have been installed at the Baltic 2 offshore wind farm, the project’s developer EnBW confirmed to Offshore WIND. Workers on the jack-up vessel Goliath have driven the jacket pin piles into the seabed. An important part of the work on the foundations is now complete, the company said. Baltic 2 consists […]

  • 24 May 2012

    The US Army Corps of Engineers, Detroit District, intends to solicit for navigation channel dredging and construction of an offloading platform at Duluth Superior Harbor, Minnesota. This project consists of dredging in the Duluth-Superior Harbor federal navigation channel and constructing an offloading platform in the Erie Pier Confined Disposal Facility (CDF) in Duluth, MN. These […]

  • 5 March 2020
    Business & Finance

    Wan Hai Lines has acquired two containerships from PIL.

  • 13 October 2015

    Sempra Energy’s Cameron LNG is moving forward with the construction of its liquefaction and export project in Hackberry, Louisiana. “In just over a year Cameron LNG has cleared the ground for the liquefaction project and over 800 team members are working on site in two shifts,” the company said in its latest project update. The project […]

  • 3 July 2020
    Equipment, Infrastructure, Vessels

    A pile installation frame (PIF) for Seaway Yudin’s pin-pile installation work in Taiwan has been loaded onto a vessel in the Port of Rotterdam, from where it will be transported to Taiwan, Seaway 7 said on social media. The company did not name the project for which the PIF is being transported. Seaway 7 has […]

  • 3 February 2015

    Dominion filed a status report and progress on the construction of its Cove Point LNG export project to the Federal Energy Regulatory Commission.

  • 27 September 2016

    German pipe production specialist EEW Group has won a contract for Beatrice offshore wind farm jacket foundations. The company said it had received contracts for all three structural steelwork businesses and will thereby deliver the total volume of structural pipes needed to build the jacket foundations for the wind farm. EEW says that the company’s three German production centres […]

  • 11 September 2018
    Equipment

    EEW Special Pipe Constructions GmbH has received an order from the Dutch company Heerema Marine Contractors to manufacture 16 pin piles for the Leviathan project. The Leviathan field is located about 125 km west of Haifa, Israel in the eastern Mediterranean and contains an estimated gas deposit of about 22 trillion cubic feet (621 BCM). […]

  • 3 February 2015

    Dominion filed a status report and progress on the construction of its Cove Point LNG export project to the Federal Energy Regulatory Commission.