Search results for: p-61

213106 results

A list of search results

  • 24 June 2016
    Business & Finance

    Finder Exploration has been awarded a new Exploration Permit (EP) AC/P61, located in the Vulcan Sub-basin, western Bonaparte Basin in the Timor Sea, approximately 250 km offshore and 650 km from Darwin off the northwest coast of Western Australia. The permit, now fully owned and operated by Finder, was awarded to the company on Thursday, June […]

  • 3 January 2014

    P-61 has been completed and is on its way to the Papa-Terra field, the unit left BrasFels shipyard in the Angra dos Reis bay (RJ), on Dec 31, where the unit was built and assembled. The unit will make a technical stop for diesel and water near Ilha Grande and continue on until its final location, […]

  • 17 March 2015
    Operations & Maintenance

    Petrobras has started production on platform P-61 in Papa Terra field, located near the southern perimeter of the Campos Basin (State of Rio de Janeiro), 110 km off the coast of Brazil and with a water column of 400 to 1,400 m. Moored in waters 1,200 m deep, the P-61 completes the production system for  […]

  • 17 March 2015
    Exploration & Production, Project & Tenders

    Petrobras has announced the start-up of platform P-61 in Papa Terra field, in the southern tip of Campos Basin, 110 km off the coast of Brazil and at a water depth (distance between water surface and sea floor) ranging from 400 to 1,400 meters. Set up at a water depth of 1,200 meters, platform P-61 […]

  • 3 January 2014

    Petrobras has informed that the P-61 platform has been completed and has left Angra for Papa-Terra field. Tuesday, 12/31/2013, the P-61 left the BrasFels shipyard in the Angra dos Reis bay (RJ) where the unit was built and assembled. The unit will make a technical stop for diesel and water near Ilha Grande and continue […]

  • 3 January 2014
    Business & Finance

    On Tuesday December 31, 2013 the P-61 left the BrasFels shipyard in the Angra dos Reis bay (RJ) where the unit was built and assembled. The unit will make a technical stop for diesel and water near Ilha Grande and continue on until its final location, the Papa-Terra field in the Campos Basin. The journey […]

  • 5 December 2013
    Business & Finance, Operations & Maintenance

    Petrobras announces that the P-58 FPSO production platform and the SS-88 TAD drilling support vessel (Tender Assisted Drilling), strategic projects in the 2013-2017 Business and Management Plan, are on their way to their respective locations in Parque das Baleias and Papa Terra, respectively. Yesterday, the P-58 left the Honório Bicalho shipyard in Rio Grande (RS) […]

  • 5 December 2013

    Petrobras announces that the P-58 FPSO production platform and the SS-88 TAD drilling support vessel (Tender Assisted Drilling), strategic projects in the 2013-2017 Business and Management Plan, are on their way to their respective locations in Parque das Baleias and Papa Terra, respectively. Yesterday, 12/04/2013, the P-58 left the Honório Bicalho shipyard in Rio Grande […]

  • 10 April 2014
    Business & Finance, Operations & Maintenance

    McDermott International, Inc. (“McDermott”) announces the successful installation of the P-61 Tension Leg Wellhead Platform (“TLWP”) for the PPT BV Joint Venture, consisting of Petrobras and Chevron. Once fully commissioned and operational, the project will enter the record books as the first use of dry-tree floating technology offshore Brazil and the first Tension Leg Platform […]

  • 9 April 2014

    McDermott International, Inc. has installed the P-61 Tension Leg Wellhead Platform (“TLWP”) for the PPT BV Joint Venture, consisting of Petrobras and Chevron. Once fully commissioned and operational, the project will enter the record books as the first use of dry-tree floating technology offshore Brazil and the first Tension Leg Platform installation offshore South America. […]

  • 5 December 2013

    PETROBRAS’ FPSO, the P-58 and the SS-88 TAD drilling support vessel (Tender Assisted Drilling) are on their way to their respective locations in Parque das Baleias and Papa Terra. The P-58 left the Honório Bicalho shipyard in Rio Grande (RS) where it was converted along with 15 modules being integrated to the unit. The platform […]

  • 5 December 2013
    Business & Finance

    PETROBRAS’ FPSO, the P-58 and the SS-88 TAD drilling support vessel (Tender Assisted Drilling) are on their way to their respective locations in Parque das Baleias and Papa Terra. The P-58 left the Honório Bicalho shipyard in Rio Grande (RS) where it was converted along with 15 modules being integrated to the unit. The platform […]

  • 29 April 2014
    Business & Finance

    Petrobras, a Brazilian oil company, in a race to become one of the five largest oil producers in the world by 2030, has last year reached the unprecedented mark of nine platforms delivered, which will add a million barrels per day to their production capacity. The Company presents the information about these nine platforms completed […]

  • 5 September 2018

    Malaysia’s Sapura Energy has farmed in a trio of Finder Exploration’s of Australian offshore exploration permits.

  • 19 June 2013

    The FPSO P-63 left the Quip/Honório Bicalho shipyard in the city of Rio Grande (RS) on Tuesday, June 18 after the modules were integrated and the platform was commissioned. The P-63 is one of the new units coming on stream in 2013 helping to increase oil production for Petrobras to reach the production target of […]

  • 19 June 2013
    Business & Finance

    The FPSO P-63 left the Quip/Honório Bicalho shipyard in the city of Rio Grande (RS) on Tuesday (18/06) after the modules were integrated and the platform was commissioned. The P-63 is one of the new units coming on stream in 2013 helping to increase oil production for Petrobras to reach the production target of 2.75 […]

  • 19 June 2013

    Petrobras has announced that the FPSO P-63 left the Quip/Honório Bicalho shipyard in the city of Rio Grande (RS) on Tuesday (18/06) after the modules were integrated and the unit was commissioned. The P-63 is one of the new units coming on stream in 2013 helping to increase oil production for Petrobras to reach the […]

  • 4 February 2020

    Petrobras has started the opportunity disclosure stage for the sale of its entire stake of the Papa-Terra field, located in the Campos Basin, and for the sale of part of its interest in exploratory blocks located in the Pará-Maranhão Basin, off Brazil. 

  • 19 July 2010
    Business & Finance, Equipment

    Dril-Quip, Inc. announced that it has been awarded a contract valued at approximately US $100 million by FloaTEC de Mexico S.A. de C.V. to supply drilling and production equipment for the P-61 Tension Leg Wellhead Platform (TLWP) to be installed in the Papa Terra field located in the Campos Basin offshore Brazil. The value of […]

  • 9 June 2014
    Business & Finance

    The multipurpose amphibious assault ship USS Bataan (LHD 5) transferred 277 persons in distress to the Armed Forces of Malta offshore patrol vessel P61, and another five persons were medically evacuated to Malta, on June 6th. Bataan and the guided-missile frigate USS Elrod (FFG 55) rendered assistance to persons in distress and provided food, water, […]

  • 21 December 2011

    Last week Shipyard De Hoop has delivered the vessel Caballo Xanthus. This 3rd supplier of the De Hoop’s ‘KISS-design’ is now on its way to Mexico. Upon arrival the final components of a so called ‘mud-plant’ shall be installed and hereafter te vessel shall commence her contract in the Mexican Gulf. Platform Supply Vessel / ‘KISS-design‘ […]

  • 29 June 2011

    The second KISS supplier, Caballo Galiceno (our yard number 435) is well on its way. Shipyard De Hoop launched the vessel last week. Shipyard De Hoop has a history of almost 1500 build vessels and more than 3000 designs. Although it is strong in the inland passengervessel and offshore markets, virtually any ship can be […]