Search results for: photo

6962 results

A list of search results

  • 2 January 2017

    Port of Esbjerg Displays Offshore Wind Bounty Denmark’s Port of Esbjerg has shared a photograph showing components for more than 100 offshore wind turbines ready for installation in the North Sea stored in the port area. Wikinger Jackets Enjoying Sunrise at Lindø A photo of Bladt Industries’ Lindø facilities, showing Wikinger jacket foundations. First Burbo […]

  • 1 January 2018

    GE’s Haliade Nacelles Waiting for Merkur GE Renewable Energy has published a photo showing its Haliade 150-6MW nacelles for the 396MW Merkur offshore wind farm being assembled at the company’s Saint-Nazaire site in France. Galloper Nacelles Start Clicking in Esbjerg The first complete nacelle built by Siemens for the 336MW Galloper offshore wind farm underwent its […]

  • 27 March 2017

    Following the installation of the jacket foundation on 15 March, the 2,900t topside for the second offshore substation at the Race Bank offshore wind farm was installed over the weekend.

  • 2 January 2018

    Take a look at some of the amazing photos that made the news last year! PHOTO: Full House at Aibel PHOTO: Heerema Presses on with Culzean Jacket Work PHOTO: Jan de Nul Takes Delivery of New Multipurpose Vessel PHOTO: Topaz Newbuild on Shakedown Cruise PHOTO: Subsea 7 Installs Culzean Export Pipe PHOTO: Jan de Nul Wraps […]

  • 21 August 2015

    The first offshore transformer station at the Gemini offshore wind farm was placed on top of the jacket foundation yesterday. After installing the jackets earlier this month, the heavy-lift vessel Rambiz is also carrying out the rest of the work on the substation installation. A joint venture between Cofely Fabricom, CG and Iemants, is in charge of the two offshore […]

  • 27 March 2017

    Following the installation of the jacket foundation on 15 March, the 2,900t topside for the second offshore substation at the Race Bank offshore wind farm was installed over the weekend.

  • 30 June 2017

    Sif Group has published a photo of its new site at Maasvlakte in Rotterdam accommodating, among others, piles for the Beatrice offshore wind farm foundations and monopiles for the Rentel offshore wind farm.

  • 12 July 2017
    Equipment

    The jacket for the central processing facility (CPF) on the Culzean field, located in the British sector of the North Sea, has been installed, Maersk Oil informed. It follows the installation of the wellhead platform jacket  set up in May 2016. The CPF jacket, set sail from Heerema Fabrication Group’s Vlissingen facility on June 28. The deepwater […]

  • 21 April 2015

    Offshore WIND’s photo of the day: Westermeerwind wind farm reaches a half point in the foundation installation. Namely, the ‘De Schelde’ pontoon, topped by a Liebherr crane 11350, installed the 24th foundation pile yesterday. The 35-meter long foundation piles, weighing around 250 tons, are being transported from Vlissingen to the project site, 500m from the […]

  • 20 June 2018
    Business & Finance

    Subsea technology provider Teledyne Marine has announced the return of its annual photo contest. All Teledyne Marine customers and product users are invited to submit their favorite photos showing any of Teledyne Marine’s over 400 products in action in their office, laboratory or deployed in the field. Nine awards will be given out this year […]

  • 18 April 2014
    Technology

    Offshore WIND’s photo of the day: first turbines installed at Vattenfall’s DanTysk offshore wind farm. At the beginning of April, Vattenfall commenced the installation of wind turbines at its DanTysk offshore wind farm site. Now, a couple of them are up and waiting to fulfill their duty of powering up homes with clean energy. The […]

  • 8 October 2015

    Offshore WIND’s photo of the day: One of the two offshore high voltage substations (OHVS) at the Gemini offshore wind farm.  Gemini offshore wind farm has two substations for each of the two wind farm parts, Buitengaats (300MW) and ZeeEnergie (300MW). The first offshore substation at the offshore wind farm was placed on top of the […]

  • 22 April 2015

    Offshore WIND’s photo of the day: View from one of the first turbines installed at Eneco Luchterduinen offshore wind farm. The photo was taken as the first batch of turbines is undergoing a quality inspection. The wind farm, located 23 kilometers off the coast of Noordwijk and Zandvoort, comprises 43 turbines with total capacity of […]

  • 30 June 2017

    Sif Group has published a photo of its new site at Maasvlakte in Rotterdam accommodating, among others, piles for the Beatrice offshore wind farm foundations and monopiles for the Rentel offshore wind farm.

  • 1 October 2014

    Malaysia’s UMW Oil & Gas has today sent us an image showing the delivery of their latest offshore jack-up drilling rig, UMW Naga 6. On the right is the newly delivered UMW Naga 6, and beside her is UMW’s second rig from CMHI, UMW Naga 7, due for delivery December 2014. The rigs are independent-leg cantilever jack-up units with a […]

  • 2 January 2018
    Business & Finance, Operations & Maintenance, Research & Development, Technology

    Tidal Energy Today has compiled photo galleries that you viewed the most in 2017.

  • 12 August 2016

    After installing the final wind turbine foundation at Burbo Bank Extension wind farm in Liverpool Bay, Van Oord’s heavy lift vessel Svanen has moored at Harland and Wolff’s Commissioning Quay in Belfast.   Svanen completed the foundations installation at the wind farm in July, and will now undergo repairs and outfitting at Harland and Wolff’s shipyard, ahead of its next […]

  • 9 September 2014
    Business & Finance, Equipment, Technology

    Dredge Yard, one of the world’s leading manufacturers of dredging and mining equipment, took the opportunity of the recent “Dredging in India” conference to present its new model, the ECO200 dredger. At the event, which was held in Mumbai from 3-4 September 2014, the company’s Operations Manager, Michel Debo introduced one of the company’s latest developments, […]

  • 31 July 2015

    Offshore WIND’s photo of the day: Westermeerwind wind farm components arrive in port of Amsterdam. SC Astrea, cargo ship, sailed from Esbjerg, Denmark on Monday carrying components for the installation at Westermeerwind. The vessel was loaded with towers, blades and hubs for the 144 MW project being developed in the shallow waters of IJsselmeer. The assembly […]

  • 9 May 2017

    Gravity-based foundations that will support the offshore wind turbines at the Tahkoluoto are currently lined up in Pori, Finland, and waiting for the installation vessel Vole au vent, due to arrive by the end of next week.

  • 5 January 2015
    Vessels

    Bechtel published a photo of Methane Rita Andrea leaving Gladstone harbour fully laden with Queensland’s first LNG.

  • 21 November 2017
    Equipment

    Heerema Fabrication Group (HFG) has started the construction of the Peregrino II jacket with the steel cutting ceremony at its Vlissingen yard in The Netherlands. The company secured the construction contract for the Peregrino II jacket by South Atlantic Holding, on behalf of Statoil in May 2017. The Peregrino jacket will be approximately 135 meters […]