Search results for: reinstallation

523 results

A list of search results

  • 8 December 2014
    Business & Finance

    The Channel Safety Dredging Program in Geelong is near completion with the next phase scheduled to start today, December 8th, in the vicinity of the Corio Bay City Bend. This phase involves reinstalling four beacons which have been refurbished. The new positions of the beacons mark the wider City Bend. Four large 3 meter diameter steel buoys with top marks […]

  • 3 February 2012
    Business & Finance, Operations & Maintenance

    When the bow thruster unit of a 348-meter container vessel needed to be overhauled, Hydrex sent a diver/technician team to the ship to remove the unit on-site and reinstall it again two months later after it had been overhauled. The operation was performed in stages at several locations to allow the vessel to keep to […]

  • 13 April 2017
    Business & Finance, Equipment, Operations & Maintenance

    Hydrex carried out removal and reinstallation of the bow thruster on a 82-meter offshore supply vessel while the vessel was at anchorage in Dampier, Australia. By carrying out both parts of the operation underwater the ship could stay on the project and did not have to go to drydock. Hydrex team went on board and […]

  • 11 July 2014
    Business & Finance, Equipment, Operations & Maintenance

    Hydrex team has replaced the three leaking bow thruster shaft seals of a 400-meter container ship in Gdansk, Poland. The operation was performed on-site and underwater using the company’s flexible mobdocks. The vessel was able to continue its commercial activities without any hindrance or delay. Together with all the necessary equipment, the diver/technicians mobilized from […]

  • 18 October 2017
    Business & Finance, Operations & Maintenance, Research & Development, Technology

    Atlantis Resources has reinstalled the fourth tidal turbine in the Pentland Firth off Scotland, wrapping up the Phase 1A of the MeyGen project.

  • 28 November 2014
    Business & Finance, Equipment, Operations & Maintenance

    Hydrex diver/technician team has carried out underwater stern tube seal repairs on a 196-meter LPG tanker in Panama. The ship was suffering from an oil leak, making an on-site repair necessary. Hydrex team mobilized to the tanker’s location, together with all the needed equipment. After the diving team had set up a monitoring station they removed the […]

  • 23 July 2013

    Three months after Hydrex diver/technicians removed the bow thruster of a 294-meter container vessel in Tacoma, a Hydrex team once again mobilized to this location to reinstall the overhauled unit underwater with the use of the Hydrex flexible mobdock. The superintendent of the ship was very satisfied with the first part of the operation. The […]

  • 9 September 2011
    Business & Finance, Operations & Maintenance

      In the last few years Hydrex divers have carried out thruster operations on numerous occasions around the world. This article gives a summary of some of the more important ones. Replacement of azimuth thruster on crane barge in Gabon A Hydrex diver/technician team mobilized to an offshore crane barge stationed at its service base […]

  • 16 May 2017
    Business & Finance

    In an effort to keep the public informed with regard to the Portage Cove Harbor Expansion Project, the Haines Borough (AK) has released the latest update on the project. According to the update, Pacific Pile & Marine will be continuing inner harbor dredging this week. “Our dredging operations will be working around the south of the […]

  • 29 September 2017
    Business & Finance, Equipment, Operations & Maintenance

    Hydrex divers have recently repaired a stern tube in Veracruz, Mexico. The operation consisted of the underwater replacement of the damaged seals on both assemblies of a semi-submersible offshore platform. The unit left the field after its project was finished and was berthed alongside to have repair and maintenance work carried out without docking. Hydrex […]

  • 31 August 2012
    Equipment

    In July, Hydrex performed the removal of a bow thruster that needed to be overhauled, and reinstalled a spare unit in one take. Both parts of the operation were carried out during a 200-meter container vessel’s stop in Antwerp. A diver/technician team carried out a preliminary inspection and took the necessary measurements prior to the […]

  • 31 August 2017
    Business & Finance, Operations & Maintenance, Research & Development, Technology

    Atlantis Resources has reinstalled the third Andritz Hydro Hammerfest (AHH) tidal turbine for the MeyGen tidal energy project which is approaching a 2GWh milestone of tidal power generation.

  • 1 June 2015
    Business & Finance, Equipment, Operations & Maintenance

    Hydrex diver/technician team carried out underwater stern tube seal repairs on a 200-meter roro vessel in Port Kembla, Australia. The ship was suffering from an oil leak, making an on-site repair necessary. Taking advantage of the Hydrex flexible mobdock technique the team was able to carry out the entire operation on-site and underwater. The Hydrex […]

  • 10 July 2017
    Business & Finance, Operations & Maintenance, Research & Development, Technology

    Atlantis Resources has reinstalled and reconnected two of the four turbines of the MeyGen tidal array Phase 1A project.

  • 18 October 2013

    To save time and money for the owner of a 69-meter offshore supply vessel, Hydrex removed the stern thruster of the ship and installed a new unit during the vessel’s stop in Limbee, Cameroon. By carrying out both parts of the operation underwater the ship could continue its commercial activities and did not have to […]

  • 22 October 2017
    Business & Finance, Operations & Maintenance, Research & Development, Technology

    Tidal Energy Today has compiled the top news from tidal and wave energy industry from October 16 – 22, 2017.

  • 28 July 2016
    Business & Finance, Operations & Maintenance, Research & Development, Technology

    Mojo Maritime was contracted by Sabella to assist the company with the retrieval of its D10 tidal turbine off Ushant island, France.

  • 18 October 2017
    Equipment, Operations & Maintenance

    Atlantis has reinstalled the fourth and final turbine for the MeyGen Phase 1A project in the Pentland Firth. With the reinstallation of the fourth 1.5MW AR1500 turbine, MeyGen Phase 1A will now be capable of operating at its full 6 MW capacity generating full ROC and power revenues. The offshore works were executed by the Atlantis offshore […]

  • 25 July 2017
    Business & Finance

    James Fisher Marine Services (JFMS), part of the global marine services company James Fisher and Sons, has redeployed two Andritz turbines at MeyGen 1A tidal array in Scotland’s Pentland Firth. The reinstallation was completed, with the offshore works for both turbine installations and connection to the grid carried out to schedule. The turbines have both […]

  • 1 September 2017
    Business & Finance, Equipment, Operations & Maintenance

    Tidal power developer Atlantis said that the third Andritz Hydro Hammerfest (AHH) turbine was reinstalled this week, as part of the Phase 1A of the MeyGen project in the Pentland Firth. The offshore works were executed by the Atlantis offshore operations team. All three AHH turbines, which were recovered earlier this year following an initial […]

  • 9 August 2017
    Operations & Maintenance

    MeyGen has passed 1 GWh exported to the grid, Tim Cornelius CEO of Atlantis and Chairman of MeyGen informed. Two Andritz Hydro Hammerfest (AHH) tidal turbines are generating clean energy to the UK grid at the MeyGen site. The turbines were recently reinstalled at the MeyGen tidal array site in the Pentland Firth, off Scotland, following system enhancements […]

  • 15 October 2018
    Business & Finance, Operations & Maintenance, Research & Development, Technology, Vessels

    One of the repaired Andritz Hydro Hammerfest (AHH) tidal turbines has been mobilized for reinstallation at the MeyGen tidal turbine array in the Pentland Firth, off Scotland.