Advertisement

Dredging

about 16 years ago

Natural Sand Flow Requires Periodically Dredging (USA)

The U.S. Army cut through Cape Canaveral a half-century ago, defying Mother Nature’s normal flow of sand.Because the Corps of Engineers decided to dredge the deep channel to the ocean, the sand collects to the north and periodically must be moved to the south. That would happen naturally, were Port

1 minutes read

The U.S. Army cut through Cape Canaveral a half-century ago, defying Mother Nature’s normal flow of sand.Because the Corps of Engineers decided to dredge the deep channel to the ocean, the sand collects to the north and periodically must be moved to the south. That would happen naturally, were Port Canaveral not in the way…

[mappress]

Source:floridatoday,April 5,2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.