Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: Aker Solutions to Deliver Goliat Mooring System to ENI
Fossil Energy

July 22, 2010 · about 16 years ago

Norway: Aker Solutions to Deliver Goliat Mooring System to ENI

Aker Solutions has won a contract with Eni Norge for the design and supply of an on-vessel Pusnes mooring systemTM for the Goliat FPSO. The total contract value for Aker Solutions is approximately NOK 150 million (USD $24 Million).

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Solutions has won a contract with Eni Norge for the design and supply of an on-vessel Pusnes mooring systemTM for the Goliat FPSO. The total contract value for Aker Solutions is approximately NOK 150 million (USD $24 Million).

The contract consists of 14 Pusnes fairlead chain stoppersTM and three moveable Pusnes windlassesTM for 165 mm chain size. The hull for the round-shaped production unit (FPSO) will be built in South-Korea. After completion, the FPSO will be located at the Goliat field in the Barents Sea.

Aker Solutions has developed the fairlead chain stopper design, which is an innovative on-vessel mooring solution with several advantages. The fairlead chain stopper constrains the mooring load to a limited area on the hull. Its long, pivoting stopper arm reduces chain wear and increases the fatigue life of the chain. The design eliminates the need for reinforcements at the deck level thereby decreasing the overall weight.

Leif Haukom, president of Aker Solutions’ offshore mooring systems business, commented: “We are proud to be selected as maker of the on-vessel mooring equipment for the first production unit made for the Barents Sea. This contract underlines Aker Solutions’ strong position for mooring systems to installations in harsh environments, such as the Barents Sea.”

The equipment will be manufactured in Norway, Poland and South Korea and the delivery will take place during 2011. The contract party for Aker Solutions is Aker Pusnes AS.

[mappress]

Source: Akersolutions,July 22, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free