Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Bounty Announces Progress Report on New Seaclem 1 Well Offshore Australia
Fossil Energy

December 24, 2010 · about 16 years ago

Bounty Announces Progress Report on New Seaclem 1 Well Offshore Australia

Bounty Oil & Gas NL announces progress report on the New Seaclem 1 well in PEP 11, offshore NSW. MEC Resources investee company Advent Energy Ltd (Advent) has reported: Progress since Last Report The well was spudded at 00.00 hours AEDST 15 December 2010 and drilled the 9 7/8″ pilot hole to 310.5 me

2 minutes read
  • LinkedIn
  • X
  • Email

Bounty Oil & Gas NL announces progress report on the New Seaclem 1 well in PEP 11, offshore NSW. MEC Resources investee company Advent Energy Ltd (Advent) has reported:

Progress since Last Report

The well was spudded at 00.00 hours AEDST 15 December 2010 and drilled the 9 7/8″ pilot hole to 310.5 metres BRT.

Since the last report progress has been as follows:

– Run and cement 13 3/8″ casing to the intermediate casing point at 314 metres.

– Install BOP’s and subsea wellhead equipment.

– Drill ahead to the next casing point at approximately 346 metres

– Rig up and conduct wireline logging over the interval 314 to 346 metres. The logging instruments included “look ahead” seismic instruments intended to measure seismic waves for interpreting pore fluids beyond the present drilling depth.

– At 0600 on 24 December 2010 the well was at 346 metres.

Forward Operations:

Prepare to open (widen) the hole to 12 1/4″ and then run 9 5/8″ casing and cement in hole at approximately 346 metres BRT. Drill ahead to target zones.

The drilling schedule suggests drilling through the reservoir section will now occur on approximately Tuesday 28th December, 2010.

The well will evaluate any hydrocarbon bearing reservoirs with wireline logging tools. The drilling program does not incorporate flow testing or flaring of hydrocarbons. Upon conclusion of the drilling activity, the well will be plugged and abandoned as per the approved drilling program and best practice.

Bounty will release further details as soon as this information is available.

The well operator is Asset Energy Pty Limited a wholly owned subsidiary of Advent Energy Limited.

[mappress]

Source: Bounty Oil & Gas, December 24, 2010;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Baker Hughes helping chart a course for LNG and monetize Venezuela’s gas reserves
  2. 2Yinson Production and Eni amplifying African FPSO’s gas capacity
  3. 3Sea Lion project on the hunt for new contractors amid Argentine sanction threats
  4. 4Seatrium picks up 9th FSRU conversion job with Karpowership

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free