Advertisement

Subsea

about 15 years ago

CTC Marine Continues Installation of Subsea Power Cables on BARD Offshore 1 Wind Farm (Germany)

CTC Marine has returned to Germany to continue the installation of subsea inter-array power cables on BARD Offshore 1 Wind Farm. The first array cable of the 2011 campaign has already been installed. CTC is installing 80 inter-array power cables in total on the 400MW development located in the Germa

1 minutes read

CTC Marine has returned to Germany to continue the installation of subsea inter-array power cables on BARD Offshore 1 Wind Farm. The first array cable of the 2011 campaign has already been installed.

CTC is installing 80 inter-array power cables in total on the 400MW development located in the German Bight. The 2011 campaign follows on from last year and is expected to last up to 7 months. CTC is utilizing the Maersk Recorder mobilized with CTC’s CMROV 4 Jet Trenching ROV.

( subseauk )

[mappress]

Source: subseauk, April 11, 2011; Image: bard-offshore

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.