Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: Statoil to Drill Wellbore 6407/3-1 S Using Transocean Leader Rig
Fossil Energy

April 15, 2011 · about 15 years ago

Norway: Statoil to Drill Wellbore 6407/3-1 S Using Transocean Leader Rig

The Norwegian Petroleum Directorate has granted a drilling permit for wellbore 6407/3-1 S, cf. Section 8 of the Resource Management Regulations. Wellbore 6407/3-1 S will be drilled from the Transocean Leader drilling facility at position 64°46’32.49” N and 7°42’14.23” E after it has completed drilli

1 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian Petroleum Directorate has granted a drilling permit for wellbore 6407/3-1 S, cf. Section 8 of the Resource Management Regulations.

Wellbore 6407/3-1 S will be drilled from the Transocean Leader drilling facility at position 64°46’32.49” N and 7°42’14.23” E after it has completed drilling of wildcat well 6407/4-2 for Statoil ASA in production licence 429.

The drilling programme for wellbore 6407/3-1 S relates to drilling of a wildcat well in production licence 312 where Statoil ASA is the operator with an ownership interest of 59 per cent. The other licensees are ExxonMobil Exploration & Production Norway AS (24 per cent) and Eni Norge AS (17 per cent). The area in this licence consists of part of block 6407/3 and part of block 6407/6. The well will be drilled about six kilometres north of the Mikkel gas/condensate field.

Production licence 312 was awarded on 12 December 2003 in APA 2003. This is the third well drilled in the licence.

The permit is contingent upon the operator having secured all other permits and consents required by other authorities before the drilling starts.

[mappress]

Source: Ptil, April 15, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free