Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazil: Petrobras, Jogmec to Conduct Feasibilty Study on Flexible Pipe Design for Pre-Salt Cluster
Fossil Energy

May 12, 2011 · about 15 years ago

Brazil: Petrobras, Jogmec to Conduct Feasibilty Study on Flexible Pipe Design for Pre-Salt Cluster

Petrobras has signed a Specific Agreement with Jogmec – Japan Oil, Gas, and Metals National Corporation, with the aim of commencing a technical feasibility study on flexible pipes for oil production in the pre-salt cluster. This study is the second collaboration between the two companies. The relati

1 minutes read
  • LinkedIn
  • X
  • Email

Petrobras has signed a Specific Agreement with Jogmec – Japan Oil, Gas, and Metals National Corporation, with the aim of commencing a technical feasibility study on flexible pipes for oil production in the pre-salt cluster.

This study is the second collaboration between the two companies. The relationship between Petrobras and Jogmec began in December 2005, when they signed a memorandum of understanding for collaboration on activities of mutual interest related to oil and gas exploration and production, health, safety and environment, and sector-related research and development projects. They first joined forces on research projects in 2006, working on Mono-column (cylindrical) Floating Production, Storage, and Offloading (FPSO) systems. The studies have been completed successfully and show promising results.

The technical feasibility study will be carried out by a Japanese consortium which will include Furukawa Electric Co. Ltd. Its brief is to develop a flexible pipe design for offshore oil production in ultradeep waters in the pre-salt cluster. The study is scheduled for completion in December 2014.

After project technical validation, the possibility of setting up a production plant in Brazil will be evaluated.

[mappress]

Source:Petrobras , May 12, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free