Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›UK: DOF Subsea Wins Ivanhoe/Rob Roy Field Decommissioning Contract from Hess
Fossil Energy

May 25, 2011 · about 15 years ago

UK: DOF Subsea Wins Ivanhoe/Rob Roy Field Decommissioning Contract from Hess

DOF Subsea UK, a subsidiary of DOF Subsea, has secured a decommissioning contract with HESS in the Ivanhoe/Rob Roy Field, North Sea. The project will last for approximately 21 days and is scheduled to start in Q3 2011. The Ivanhoe and Rob Roy fields are located approximately 120miles northeast of Ab

1 minutes read
  • LinkedIn
  • X
  • Email

DOF Subsea UK, a subsidiary of DOF Subsea, has secured a decommissioning contract with HESS in the Ivanhoe/Rob Roy Field, North Sea. The project will last for approximately 21 days and is scheduled to start in Q3 2011.

The Ivanhoe and Rob Roy fields are located approximately 120miles northeast of Aberdeen, in Block 15/21A of the UK Sector of the North Sea in a water depth of approximately 140m. The Hamish field is located in UK Block 15/21B but its single producing well is located in UK Block 15/21A and forms part of the Rob Roy wellhead cluster.

A distance of approximately 2miles separates the Ivanhoe and Rob Roy fields. Located centrally between the Ivanhoe and Rob Roy fields is an anchored semi-submersible floating production facility (FPF), designated the AH001. In both the Ivanhoe and Rob Roy fields, the numbers of subsea wellheads are grouped around central subsea production manifolds Ivanhoe (IVPM) and Rob Roy (RRPM). Connection of the wellheads to IVPM and RRPM is made by means of Coflexip flexible flowline jumpers and electro-hydraulic control bundles. The production manifolds are connected in turn, by means of flexible flow and control lines, to a riser base manifold (RBM) located on the seabed 300m to the north-northwest of AH001.

[mappress]

May 25, 2011; Image:Hess

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free