Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›PSA Norway Carries Out Audit of Emergency Preparedness on Asgard B
Fossil Energy

July 21, 2011 · about 15 years ago

PSA Norway Carries Out Audit of Emergency Preparedness on Asgard B

The audit of emergency preparedness on Åsgard B was carried out in parallel with an audit of employee involvement from 18-20 May 2011. During 18-20 May 2011, the Petroleum Safety Authority Norway (PSA) carried out an audit activity targeting Åsgard B, which is a floating production facility for gas

2 minutes read
  • LinkedIn
  • X
  • Email

The audit of emergency preparedness on Åsgard B was carried out in parallel with an audit of employee involvement from 18-20 May 2011.

During 18-20 May 2011, the Petroleum Safety Authority Norway (PSA) carried out an audit activity targeting Åsgard B, which is a floating production facility for gas and condensate. Åsgard B is located on Haltenbanken and is operated by Statoil Petroleum AS.

Simultaneously with this audit activity, the PSA also carried out an audit with the topic of employee involvement. For practical purposes, two separate audit reports were prepared.

Background

The audit activity targeted the emergency preparedness discipline and was mainly based in the petroleum regulations, including “Chapter VI Operational prerequisites for startup and use, and Chapter XIII Emergency preparedness of the Regulations relating to conduct of activities in the petroleum activities (Activities Regulations), and Chapter VI Emergency preparedness of the Regulations relating to design and outfitting of facilities, etc. in the petroleum activates (Facilities Regulations)”.

The audit activity was based on one of the PSA’s main priorities for 2011, which is ”Technical and operational barriers”.

Objective

The objective of the audit was to verify whether operation of the facility complies with the regulatory requirements, as well as Statoil’s own internal company requirements.

The audit activity set out to verify whether the emergency preparedness level on the Åsgard B production facility complied with the requirements stipulated in the regulations and in Statoil’s own governing documents.

The following aspects where emphasises during the audit:

Results

The audit activity was well-facilitated by Statoil and the involved personnel contributed in a constructive and positive manner.

The main impression is that emergency preparedness is well-maintained on Åsgard B. The emergency preparedness organisation appeared robust. However, some deficiencies were identified in connection with technical and operative factors of the emergency preparedness. The following nonconformities in relation to the regulations were identified:

Furthermore, improvement items were identified in connection with:

[mappress]

Source: PTIL, July 21, 2011; Image: Statoil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free