Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Petrobras Starts Production at P56 Platform, Offshore Brazil
Fossil Energy

August 17, 2011 · about 15 years ago

Petrobras Starts Production at P56 Platform, Offshore Brazil

Petrobras has put semi-submersible platform P-56 into operation in the Campos Basin’s Marlim Sul field, (state of Rio de Janeiro). The unit went into production from well 7-MLS-163HPRJS, which can produce up to 16,000 barrels per day. Installed at a water depth of 1,670 meters, the new platform was

1 minutes read
  • LinkedIn
  • X
  • Email

Petrobras has put semi-submersible platform P-56 into operation in the Campos Basin’s Marlim Sul field, (state of Rio de Janeiro). The unit went into production from well 7-MLS-163HPRJS, which can produce up to 16,000 barrels per day.

Installed at a water depth of 1,670 meters, the new platform was designed to process up to 100,000 barrels of oil per day when it reaches full capacity, which is expected in the first quarter, 2012. In addition to heavy oil (18 °API), the P-56 is capable of processing and treating up to 6 million cubic meters of natural gas per day.

The platform will be interconnected to 21 wells, 10 of which are oil producers and 11 are water injectors. Oil will be transported by pipeline to platform P-38, an FSO (floating oil and gas storage and offloading system) unit anchored 20 km away from the P-56. From the P-38, the oil will then be transported on shuttle tankers and the natural gas will be piped to Cabiúnas terminal.

P-56 measures 125 meters in length, 110 meters in width, stands 137 meters tall and weighs more than 54,000 tons. Construction of P-56 topside modules has a high level of national content. The hull was entirely built in Brazil, which shows local industry capacity to meet orders placed by Petrobras.

[mappress] Source: Petrobras, August 17, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free