Advertisement

Fossil Energy

about 15 years ago

MSI Working for Maersk Oil, Offshore Angola

MSI announced that it has successfully completed mobilisation of a current mooring, as well as a metocean buoy, for Maersk Oil Angola in Block 16 offshore Angola in approximately 1,200m water depth. The primary objective of the project is to collect site specific current, wave and meteorological dat

1 minutes read

MSI announced that it has successfully completed mobilisation of a current mooring, as well as a metocean buoy, for Maersk Oil Angola in Block 16 offshore Angola in approximately 1,200m water depth.

The primary objective of the project is to collect site specific current, wave and meteorological data through the entire water column in sufficient detail to ensure that the design of a floating production system can be optimised.

The current mooring comprises a combination of current profilers, current meters and CTD, while the metocean buoy (an Axys 1.8m Watchmate) comprises wave, surface current and meteorological sensors.

Operations were conducted from the vessel Ragnhild K, mobilised from Luanda and MSI is being assisted by their local partners Zamexi Lda.

The moorings will be serviced at 3 monthly intervals over the period of a year, and data from the metocean buoy is being transmitted in real-time to MSI’s offices, where it is placed on a password-protected website for the client to access.

[mappress] Source:MSI ,September 5, 2011;

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.