Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Norway: Fire at Huldra Platform Extinguished, Statoil Says
Fossil Energy

September 13, 2011 · about 15 years ago

Norway: Fire at Huldra Platform Extinguished, Statoil Says

At 14.30 today a fire was reported in an air compressor compartment on the Huldra platform in the North Sea, which is situated west of Mongstad. The fire was extinguished at 14.50., Statil announced on its website. None of the 19 persons on board the platform were injured in the incident. Huldra has

1 minutes read
  • LinkedIn
  • X
  • Email

At 14.30 today a fire was reported in an air compressor compartment on the Huldra platform in the North Sea, which is situated west of Mongstad. The fire was extinguished at 14.50., Statil announced on its website.

None of the 19 persons on board the platform were injured in the incident.

Huldra has been developed with a wellhead platform which ranks as the first Statoil offshore installation designed for normally unstaffed operation. This facility is being run from Veslefrikk B.

The gas and condensate (light oil) field was brought on stream in November 2001.

Huldra lies in blocks 30/2 and 30/3, about 16 kilometres from Veslefrikk.

Gas from Huldra is piped in a dedicated 140-kilometre line to the Heimdal field for processing and onward transmission by pipeline to continental Europe. Condensate is piped to Veslefrikk for processing.

Statoil proved the field in 1982, and development work began in the spring of 1999.

Aker Verdal in mid-Norway built the platform jacket, which was towed out and placed on the field in the summer of 2000. The Mærsk Gallant rig started drilling production wells immediately afterwards.

Constructed at Kværner’s Rosenberg yard in Stavanger, the Huldra topside was shipped out and installed on the jacket in the spring of 2001.

Statoil’s emergency response organisation was mobilised and the public rescue service alerted.

[mappress] Source:Statoil ,September 13, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1JERA deepens Australian LNG foothold with larger stake in Chevron’s project
  2. 2MoU charts the path for tidal and ocean current energy projects in Chile
  3. 3Seadrill hit with $55 million bill after appeals court upholds rig breach ruling
  4. 4Sunda steps closer to dusting off 1985 gas field as New Zealand bid goes exclusive

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free