Advertisement

Subsea

about 15 years ago

SPT Offshore Installs 9 Suction Piles for Bibby at Ithaca Athena (UK)

SPT Offshore installed 9 Suction piles for Bibby Offshore for Ithaca Athena FPSO mooring. For Bibby Offshore, SPT installed nine (9) suction piles of OD 5.5-6.5m x 10-11m deep. The suction piles will be used to moor the Ithaca Athena FPSO in 140m water depth. SPT’s strong SAPS-004 suction pump was u

1 minutes read

SPT Offshore installed 9 Suction piles for Bibby Offshore for Ithaca Athena FPSO mooring.

For Bibby Offshore, SPT installed nine (9) suction piles of OD 5.5-6.5m x 10-11m deep. The suction piles will be used to moor the Ithaca Athena FPSO in 140m water depth.

SPT’s strong SAPS-004 suction pump was used. Actual suction time was only 30 minutes per suction pile.

The SAPS-004 suction pump was docked subsea using the ROV. Release was also accomplished following installation by remotely control and monitored by ROV.

[mappress] Source: SPT Offshore, September 27, 2011; Image:Ithaca Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.