Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Sredne-Nevsky Shipyard Builds Missile Boat Gayratly for Turkmenistan
Shipbuilding

September 27, 2011 · about 15 years ago

Sredne-Nevsky Shipyard Builds Missile Boat Gayratly for Turkmenistan

Having successfully passed sea trials, Project 12418 missile boat Gayratly (hull number 829, serial number 218) in the nearest days will leave outfitting quay of JSC Sredne-Nevsky Shipyard and head for Turkmenistan via internal waterways. First missile boat of this project – Edermen (hull number 828

1 minutes read
  • LinkedIn
  • X
  • Email

Having successfully passed sea trials, Project 12418 missile boat Gayratly (hull number 829, serial number 218) in the nearest days will leave outfitting quay of JSC Sredne-Nevsky Shipyard and head for Turkmenistan via internal waterways.

First missile boat of this project – Edermen (hull number 828, serial number 217) – left the yard early in Sept after effective state trial program and has already arrived to Astrakhan.

Both missile boats were built under Russian-Turkmenian military technical cooperation program. The contract was signed in 2008, and Sredne-Nevsky shipyard won the tender. First boat was laid down in the shipyard’s slipway in March 2009, the second – in June. The boats were launched in Aug 2010 and May 2011 respectively. Both vessels will be based at the port of Turkmenbashi (former Krasnovodsk).

Basic characteristics of Project 12418 missile boat Displacement: full – 510 tons, standard – 450 tons; Dimensions: length – 56.9 meters, beam – 10.2 meters, draft – 2.4 meters; Max speed – 40 knots; Fuel range at 12 knots – 2,300 nautical miles; Endurance – 10 days; Propulsion plant – 23,540-kW (32,015 shp) gas turbine GGTA M-15E.1; Armament: 4 quadruple Uran-E antiship missile launchers (combat load – 16 antiship missiles 3M24E, guidance system – 3R-60UE), 1×76-mm gun mount AK-176M (combat load – 152 rounds), 2×30-mm gun mount AK-630M (combat load – 4,000 rounds), 12 MANPADS Igla ; Crew – about 40 men.

[mappress]

Source: RusNavy, September 27, 2011

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Japanese shipping major enters CCS realm in Norway
  2. 2Shell bets big on Canada with go-ahead for LNG project expansion, doubling capacity to 28 mtpa
  3. 3Black Sea mega-project narrows first gas window to early 2027 with work in final execution stage
  4. 4New JV set up in Nigeria for work with TotalEnergies and other oil & gas majors

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free