Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Philippines: Galoc Field Production Shut for FPSO Upgrade
Fossil Energy

November 28, 2011 · about 15 years ago

Philippines: Galoc Field Production Shut for FPSO Upgrade

The Galoc Production Company (GPC), operator of Galoc oil field offshore Palawan in the Philippines, reported that production was shut in on November 23, 2011 in preparation for the FPSO Rubicon Intrepid sail-away to Singapore, expected to depart this weekend for the planned 3-month turret installat

1 minutes read
  • LinkedIn
  • X
  • Email

The Galoc Production Company (GPC), operator of Galoc oil field offshore Palawan in the Philippines, reported that production was shut in on November 23, 2011 in preparation for the FPSO Rubicon Intrepid sail-away to Singapore, expected to depart this weekend for the planned 3-month turret installation work program at Keppel shipyard. Cargo onboard is scheduled to be lifted on November 25, 2011 which will be the last offtake for the year.

The upgrade of the mooring system to a turret system is expected to substantially increase the reliability and uptime of the FPSO and is a crucial component of infrastructure to enable the Galoc Joint Venture to move ahead with a potential Phase II development program.

While the FPSO is out of field, the seabed anchoring and riser modification will be undertaken in preparation for the reconnection of the FPSO on return to the field in late Q1 2012. Production will re-commence shortly after the FPSO reconnection.

The Galoc field is located in Service Contract SC14-C (Galoc Sub Block) in 290m of water approximately 65km North West of Palawan in the Republic of the Philippines.

The original development involved the construction of two subsea horizontal production wells, with extended reservoir contacts, tied back to a Floating Production Storage and Offloading (“FPSO”) facility via a short seabed pipeline and mid water riser system.

[mappress] Offshore Energy Today Staff , November 28, 2011; Image: Ottoenergy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free