Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Muddy River Dredging Scheduled for April 2012 (USA)
Dredging

December 5, 2011 · about 15 years ago

Muddy River Dredging Scheduled for April 2012 (USA)

After many decades, first major restoration of Olmsted’s park system will be undertaken in April 2012. The Massachusetts Commonwealth, City of Boston and Town of Brookline are the sponsors of the Muddy River project that is to be undertaken by the U.S. Army Corps of Engineers. The prospect of the jo

1 minutes read
  • LinkedIn
  • X
  • Email

After many decades, first major restoration of Olmsted’s park system will be undertaken in April 2012. The Massachusetts Commonwealth, City of Boston and Town of Brookline are the sponsors of the Muddy River project that is to be undertaken by the U.S. Army Corps of Engineers.

The prospect of the joint federal, state, and local effort is to prevent flooding and environmental issues including restoration of Olmsted’s original vision.

The project will consist of two phases. The first phase, which commences in April, includes new 10-by-20 foot culverts that will be installed under Riverway and Brookline Avenues. Two sections of the river will be “daylighted,” or raised above ground by removing underground pipes. These actions will be undertaken due to flood control related issues.

The Muddy River and Leverett, Wards and Willow ponds will be dredged for the first time in 50 years as part of the second phase. Dredging will help remove sediment that has generated over the years and that limits river flow thus intensifying the possibility of flooding.

[mappress]

Dredging Today Staff, December 5, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free