Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USA: Port of Los Angeles, Army Corps Release EIS/EIR for APL Container Terminal Project
Dredging

December 19, 2011 · about 15 years ago

USA: Port of Los Angeles, Army Corps Release EIS/EIR for APL Container Terminal Project

The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Berths 302-306 APL Container Terminal Project that involves the improvement and expansion of the existing 291-acre terminal by 56 acres. APL operates the second larg

1 minutes read
  • LinkedIn
  • X
  • Email

The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Berths 302-306 APL Container Terminal Project that involves the improvement and expansion of the existing 291-acre terminal by 56 acres. APL operates the second largest container terminal at the Port of Los Angeles.

The proposed project calls for the development of 1250 feet of new wharf and 41 acres of backland with planned state-of-the-art infrastructure, including 12 new cranes and Alternative Maritime Power™ (AMP™) facilities. The existing 41-acre adjacent fill was constructed from dredged harbor materials as part of the Main Channel Deepening project.

The Draft EIS/EIR assesses the proposed improvements to the terminal and projected container throughput under the current lease term with APL that expires in 2027. The environmental document includes a discussion of the proposed project’s environmental impacts and identifies mitigation measures to reduce these impacts as required under the National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA). Six project alternatives are also presented as part of the study.

The public comment and review period is from December 16, 2011 to February 17, 2012. During this time, the Port will accept written comments and will host a public meeting on January 19, 6 p.m., at the Port of Los Angeles Administration Building to present its findings and provide opportunity for public comment.

[mappress]

Dredging Today Staff, December 19, 2011; Image: portoflosangeles

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free