Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Bad Weather Slows Down Progress on Walney 2 Wind Farm (UK)
Wind Farms

December 20, 2011 · about 14 years ago

Bad Weather Slows Down Progress on Walney 2 Wind Farm (UK)

The progress on Walney 2 has been dramatically reduced due to windy weather conditions for the last couple of weeks. Heavy winds and high waves have paused the commissioning activities at Walney 2, making it impossible to access the turbines. When the wave height exceeds certain limits, all personne

1 minutes read
  • LinkedIn
  • X
  • Email

The progress on Walney 2 has been dramatically reduced due to windy weather conditions for the last couple of weeks.

Heavy winds and high waves have paused the commissioning activities at Walney 2, making it impossible to access the turbines. When the wave height exceeds certain limits, all personnel transfer to the turbines is stopped for safety reasons.

The health and safety of the workforce is of utmost importance, and according to statistics, the rough weather conditions experienced for the last month will occur. However, placing the wind turbines on a windy position is one of the main ideas with wind turbines.

About Walney Windfarms

The Walney Offshore Windfarms project is located approximately 15km west of Barrow-in-Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 – 3.6MW turbines, giving a total capacity of the Walney project of 367.2MW. The rotor diameter of the turbines is 107m for Walney 1 and 120m for Walney 2, with a maximum height of 150m from blade tip to sea level. The total area of the development is some 73km2.

[mappress] Offshore Wind Staff , December 20, 2011; Image: dongenergy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free