Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Belgium: Beverdonk Container Terminal Almost Ready
Dredging

December 22, 2011 · about 15 years ago

Belgium: Beverdonk Container Terminal Almost Ready

This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered. Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-met

1 minutes read
  • LinkedIn
  • X
  • Email

This Friday, 23 December, the mobile container crane for the new Beverdonk Container Terminal on Albertkanaal, will be delivered.

Precisely a week earlier, the terminal itself was completed. It will become operational at the beginning of 2012. The terminal currently occupies 2.5 ha and has a 200-metre quay. It can cope with an annual 60,000 TEU of containers. In time, the surface area of the terminal can be extended to 10 ha. and the quay to 500 metres. The terminal capacity will then be 300,000 TEU. A total of four container cranes will then be deployed.

The DP World terminal is available to any user and for departures to any seaport, and will initially be open from 6 a.m. to 10 p.m. In time, this will be 24/7.

They are aiming at 80% bundling of containers at the terminal and 20% local volume. The latter is linked, among other things, to logistics platforms which are being developed in phases on both sides of the terminal. Between now and 2020, the headroom of all bridges on Albertkanaal will be raised to 9.20 metres, making container shipping with four layers of containers possible.

[mappress]

Dredging Today Staff, December 22, 2011;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Over 500 piles lay the foundation for Poland’s floating LNG terminal (Gallery)
  2. 2Australian gas project enters home stretch as developments in Mexico and US Gulf make new inroads
  3. 3SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  4. 4Infill drilling ops underway offshore Oman with November start-up in sight

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free