Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Australia: Beach Starts Gas Production from Middleton Project
Clean Fuel

January 9, 2012 · about 14 years ago

Australia: Beach Starts Gas Production from Middleton Project

Beach Energy Ltd has produced first gas from the PEL106B Joint Venture’s Middleton gas production facility. Gas is now flowing to the Moonanga Tie-In Point, at which point the Raw Gas is sold to the South Australian Cooper Basin Joint Venture (Santos 66.60%, Delhi Petroleum 20.21% and Origin Energy

1 minutes read
  • LinkedIn
  • X
  • Email

Beach Energy Ltd has produced first gas from the PEL106B Joint Venture’s Middleton gas production facility.

Gas is now flowing to the Moonanga Tie-In Point, at which point the Raw Gas is sold to the South Australian Cooper Basin Joint Venture (Santos 66.60%, Delhi Petroleum 20.21% and Origin Energy 13.19%) under a Gas Sale Agreement for the sale of a minimum 3 Billion Cubic Feet of Raw Gas. Initial production rate after ramp up is expected to be 25 MMscf/d comprising about 15 TJ/d sales gas, and 1250 bbls per day of LPG and condensate.

Gas is flowing via flexible pipe which reduced capital costs and accelerated pipe laying time. This has broken new ground for Australia and more applications of this type are expected to follow.

A five well gas exploration drilling campaign has commenced in the surrounding acreage with the possibility of early connection of successful gas wells. It is intended to complete successful wells with the drilling rig (Ensign 930) to allow early testing and rapid connection to this new gathering hub at Middleton.

PEL 106B and the Middleton Brownlow production licence PPL239 are operated by Beach Energy Ltd (50%) with partner Drillsearch Energy Ltd (50%).

[mappress]

LNG World News Staff, January 9, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free