Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Arbroath Harbour Seeks Contractor for Maintenence Dredging Work (UK)
Dredging

January 20, 2012 · about 14 years ago

Arbroath Harbour Seeks Contractor for Maintenence Dredging Work (UK)

Arbroath Harbour has announced tender for 3 year contract for maintenence dredging works. Arbroath harbour is located at the mouth of the Brothock Burn, Angus at 56° 33’N 2° 35’W, 16 miles north-east of Dundee and 51 miles southeast of Aberdeen. Usage of the harbour is presently confined to commerci

2 minutes read
  • LinkedIn
  • X
  • Email

Arbroath Harbour has announced tender for 3 year contract for maintenence dredging works.

Arbroath harbour is located at the mouth of the Brothock Burn, Angus at 56° 33’N 2° 35’W, 16 miles north-east of Dundee and 51 miles southeast of Aberdeen.

Usage of the harbour is presently confined to commercial fishing boats, occasional visits by cargo vessels and numerous smaller craft offering day trips to anglers and sightseers. Visits by yachts from both overseas and other UK ports are increasing. Finger pontoons have now been installed in the Inner Basin of which 50 of the 59 berths are taken up by annual berthing by leisure craft.

Although the harbour is tidal, with a mean spring range of about 4.3m and a neap range of about 2.3m, new harbour gates were installed in May 2004 at the entrance to the Inner Basin, which open and close at half tide, thus maintaining a constant 2.5m depth of water in the Inner Basin at all times.

Materials to be removed from the harbour area and navigation channel comprise of silt, sand and gravel. The loose materials have accumulated due to ongoing sediment deposition. Apart from the discharge from the Brothock Burn and local surface water drains, it is believed that there is no other source discharge in the area which could potentially contaminate the sediments.

The dredged material from each activity is to be deposited at sea approximately 1¾ nautical miles from the outer sea wall. The contractor is required to provide engineering services for the maintenance dredging of Arbroath Harbour and Harbour navigational channel.

Tender deadline is 3.2.2012.

[mappress] Dredging Today Staff, January 20, 2012;

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free