Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USA: DEC Seeks Public Comment on Harbor at Hastings Cleanup Plan
Dredging

January 24, 2012 · about 14 years ago

USA: DEC Seeks Public Comment on Harbor at Hastings Cleanup Plan

The New York State Department of Environmental Conservation invites the public to comment on its proposed remedy for the Harbor at Hastings site cleanup, the agency announced yesterday. A public meeting is set for Thursday, January 26 at the James Harmon Community Center, 44 Main Street, Village of

2 minutes read
  • LinkedIn
  • X
  • Email

The New York State Department of Environmental Conservation invites the public to comment on its proposed remedy for the Harbor at Hastings site cleanup, the agency announced yesterday. A public meeting is set for Thursday, January 26 at the James Harmon Community Center, 44 Main Street, Village of Hastings-on-Hudson, NY at 7 p.m.

The site is listed as a Class 2 site in the State Registry of Inactive Hazardous Waste Disposal Sites. A Class 2 site represents a significant threat to public health or the environment, and action is required. DEC is proposing an amendment to the March 2004 Record of Decision (ROD) for the on-site soil areas west of the railroad tracks and a remedy for the off-site impacts, primarily to sediments of the Hudson River.

The proposed amendment and remedy include excavating soil, dredging sediment and installing a sheet pile wall offshore at the northwest corner of the site, extending into the Hudson River, to address polychlorinated biphenyls (PCBs) and metal contamination.

The site is located on 28 acres along the Hastings-on-Hudson waterfront (One River Street, Village of Hastings-on-Hudson), separated from the village commercial district by railroad tracks. The landmass was constructed in the early 1900s by placement of fill material into the Hudson River. Wire manufacturing operations caused the release of PCBs and metals to site soil, groundwater and sediments.

The 30-day comment period has been extended and will run through March 12, 2012.

[mappress]

Dredging Today Staff, January 24, 2012; Image: hudsondredging

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free