Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›UK: DONG Energy Continues Cable Work on Walney 2 Despite Bad Weather
Subsea

January 25, 2012 · about 14 years ago

UK: DONG Energy Continues Cable Work on Walney 2 Despite Bad Weather

DONG Energy annouced that despite the weather, it has been possible to energise the next cable string with eight turbines. Energizing the cable string is a vital part of the commissioning of the turbines, and the eight turbines connected to the string are expected to have first power in near future

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy annouced that despite the weather, it has been possible to energise the next cable string with eight turbines. Energizing the cable string is a vital part of the commissioning of the turbines, and the eight turbines connected to the string are expected to have first power in near future – depending on the weather.

All array cables have been jetted

Swiber Else-Marie has jetted all array cables in Walney 2 down into the seabed and has demobilised for other jobs.

Rolling Stone is expected any day

At the end of January or beginning of February, the vessel Rolling Stone will start placing the armour stones as scour protection around the turbine positions in Walney 2.

The Walney Offshore Windfarms

The Walney Offshore Windfarms project is located approximately 15km west of Barrow-in-Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 – 3.6MW turbines, giving a total capacity of the Walney project of 367.2MW. The rotor diameter of the turbines is 107m for Walney 1 and 120m for Walney 2, with a maximum height of 150m from blade tip to sea level. The total area of the development is some 73km2.

[mappress] Subsea World News Staff , January 25, 2012; Image: DONG Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free