Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazil: FPSO OSX-1 Starts Oil Production in Campos Basin
Fossil Energy

February 1, 2012 · about 14 years ago

Brazil: FPSO OSX-1 Starts Oil Production in Campos Basin

On January 31th 2012, at 18h39m50s, the FPSO OSX-1 successfully initiated the production of first oil for its anchor client OGX, the Brazilian EBX Group oil and gas company responsible for the largest private-sector exploratory campaign in Brazil. The FPSO OSX-1 is in charge of carrying out the Exte

2 minutes read
  • LinkedIn
  • X
  • Email

On January 31th 2012, at 18h39m50s, the FPSO OSX-1 successfully initiated the production of first oil for its anchor client OGX, the Brazilian EBX Group oil and gas company responsible for the largest private-sector exploratory campaign in Brazil.

The FPSO OSX-1 is in charge of carrying out the Extended Well Test on the Waimea accumulation, in the Campos Basin, through well OGX-26HP, located 80km off the coast, at a water depth of 130 meters. The FPSO OSX-1 is the first floating, production, storage and offloading unit to integrate the OSX fleet. OSX-1 was built in Korea and customized in Singapore, at Keppel’s shipyard. It is 271,75 meters long, and has the capacity to store up to 900 thousand barrels of oil. The OSX-1 has been leased to OGX for a period of 20 years, and is operated by OSX through its subsidiary OSX Serviços Operacionais Ltda.

During the coming weeks, OGX’s production team will test different flow rate levels, aiming at gradually reaching a stable production level of roughly 15 thousand barrels per day.

“Our FPSO OSX-1 has begun production of the first oil for our client OGX in extraordinary time, approximately two years after discovery. It is an important milestone in the history of the EBX Group. We are thankful for the professionalism and care of our team, in line with our commitment to operational safety, occupational health and sustainability. OSX is very proud to be part of this history and to contribute to transforming Brazil into one of the greatest oil producers in the world” stated OSX’s CEO, Luiz Eduardo Carneiro.

[mappress] Offshore Energy Today Staff, February 1, 2012; Image: OSX

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni gets the ball rolling on execution of Mediterranean gas project
  2. 2Reach Subsea and Eidesvik's 2009-built IMR vessel delivered to new owners
  3. 3Tight reservoirs on Equinor and Aker BP’s agenda amid Norway’s 2.8-billion-boe potential
  4. 4AI solutions to track wildlife at Welsh 30 MW tidal energy project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free