Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›MEO Australia Starts Floyd 3D Seismic Survey
Subsea

February 13, 2012 · about 14 years ago

MEO Australia Starts Floyd 3D Seismic Survey

MEO Australia Limited advises that the S/R Veritas Viking II commenced acquisition of the 601 km2 Floyd 3D seismic survey in WA-454-P in the Joseph Bonaparte Gulf region of the Timor Sea (Petrel sub-basin) at 21:23 (WST) on 12th February 2012. The survey is scheduled to take less than thirty days to

1 minutes read
  • LinkedIn
  • X
  • Email

MEO Australia Limited advises that the S/R Veritas Viking II commenced acquisition of the 601 km2 Floyd 3D seismic survey in WA-454-P in the Joseph Bonaparte Gulf region of the Timor Sea (Petrel sub-basin) at 21:23 (WST) on 12th February 2012. The survey is scheduled to take less than thirty days to record.

Since being awarded the Permit in June 2011, MEO has moved rapidly to assess the potential of the permit. There has been sufficient encouragement to warrant early investment in this 3D seismic survey which will cover the Marina gas and liquids discovery, the nearby Breakwater prospect and two additional leads.

The 3D survey will enable more accurate mapping and resource estimation of the Marina discovery and the scoping of a potential appraisal program.

The nearby Breakwater prospect represents a very attractive, sizeable exploration target. The survey will enable MEO to further define the Breakwater prospect and assist selection of an optimal potential drilling location.

The survey has also been designed to investigate whether the two nearby leads can be matured into drillable prospects. This survey represents an acceleration of the Permit Year 3 work commitment into Permit Year 1 and significantly reduces exploration cycle time.

[mappress] Subsea World News Staff , February 13, 2012; Image: MEO Australia

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rockhopper pledges $44 million for oil project’s second Falklands-bound FPSO
  2. 2Valaris rigs find more work in North Sea, Australia, and Suriname
  3. 3Coastal gridlock: California’s infrastructure ban and Gulf pushbacks trigger an energy tug-of-war
  4. 4Dutch design ultra-shallow-draft DSV for Gulf Region's oil & gas

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free