Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Brazil: CBO Takes Delivery of New Ulstein Design PSV
Fossil Energy

February 16, 2012 · about 14 years ago

Brazil: CBO Takes Delivery of New Ulstein Design PSV

Estaleirao Alianca Shipyard from Rio de Janeiro, Brazil, has delivered the platform supply vessel ‘CBO Atlântico’ to its owner CBO (Companhia Brasileira de Offshore) . The CBO Atlântico is the first of six ULSTEIN designed X-BOW® vessels to be built in Brazil, and the very first of the PX106 design.

2 minutes read
  • LinkedIn
  • X
  • Email

Estaleirao Alianca Shipyard from Rio de Janeiro, Brazil, has delivered the platform supply vessel ‘CBO Atlântico’ to its owner CBO (Companhia Brasileira de Offshore) .

The CBO Atlântico is the first of six ULSTEIN designed X-BOW® vessels to be built in Brazil, and the very first of the PX106 design. CBO has already two PSVs of P106 design from ULSTEIN in its fleet.

When CBO in 2010 and 2011 decided to order ULSTEIN designed PSVs for Petrobras’ oil rigs support activities outside Brazil, their demands were such: The ships had to adapt to more and more complex operations and bring with them new technologies to provide quality services, ensure safety and protect sensitive marine environments. Their final decision was to order two small vessels (PX106) and four large vessels (PX105). The vessels comply with Petrobras’ PSV3000 and PSV4500 tenders, and are designed for effective and flexible transportation of bulk and general cargo to installations offshore. The contracts include delivery of design, engineering, main equipment and commissioning follow-up.

‘CBO Atlântico’ measures 76.3 m (length overall) by 16 m (breadth), and the depth to main deck is 7.5 m. The cargo deck area is 660 m2. Three of the tanks are multitanks of the Cargomax system. She has diesel electric propulsion and azimuth propellers, and can keep a speed of approximately 15 knots. ‘CBO Atlântico’ complies with the CLEAN notation from Det Norske Veritas.

“ The cooperation with both Estaleiro Alianca and CBO has been extremely well. We are very pleased with the finish and quality of the end product,” says Project Manager at ULSTEIN, Mr. Rolf Olsen Husø.

CBO Atlântico left the yard on 2 February and has entered into an eight-year contract with Brazilian state oil company Petrobras.

The second PX106 is to be delivered later this year (Q2), and four PSVs of PX105 design will be delivered during 2012–2013.

[mappress] Offshore Energy Today Staff, February 16, 2012; Image: Ulstein Group

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free