Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Keel-Laying Ceremony for Martens Marine’s AHTS Vessel at Chinese Shipyard
Shipbuilding

February 24, 2012 · about 14 years ago

Keel-Laying Ceremony for Martens Marine’s AHTS Vessel at Chinese Shipyard

On February 15th 2012, the keel-laying ceremony of Martens Marine’s 58.7 m AHTS Vessel YX3159 was held on slipway No.2 at Yuexin shipyard. The vessel is built to ABS Class standards and includes following notations: “OFFSHORE SUPPORT VESSEL, AH, TOWING VESSEL, FIRE FIGHTING VESSEL CLASS 1”,AMS,and D

1 minutes read
  • LinkedIn
  • X
  • Email

On February 15th 2012, the keel-laying ceremony of Martens Marine’s 58.7 m AHTS Vessel YX3159 was held on slipway No.2 at Yuexin shipyard.

The vessel is built to ABS Class standards and includes following notations: “OFFSHORE SUPPORT VESSEL, AH, TOWING VESSEL, FIRE FIGHTING VESSEL CLASS 1”,AMS,and DPS-1. YX3159 is a KHIAM CHUAN MARINE (KCM) design vessel.

The vessel measures 58.7m in length, with a moulded breadth of 14.6m, and a moulded depth of 5.5m. The maximum draught is 4.75 m. The vessel can carry 42 men, 475 cubic meters of fuel oil, 230 cubic meters of fresh water, 187 cubic meters of dry bulk and 250 cubic meters of mud. Equipped with a 150-tonne line pull winch, the vessel can achieve a bollard pull of 65t. This AHTS can also achieve a speed of 13.5 knots.

YX3159 is the third of the 58.7 m AHTS vessels built by Yuexin for Martens Marine. The keel of the first and second vessel in the series, namely hull YX3157 and YX3158, had been laid last September and December 2011.

The last vessel YX3160 of the series is now in the block construction stage.

[mappress]

World Maritime News Staff, February 24, 2012; Image: YuexinShip

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free