Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Technip to Provide High-Tech Solutions for Guara & Lula Fields in Brazil
Subsea

February 27, 2012 · about 14 years ago

Technip to Provide High-Tech Solutions for Guara & Lula Fields in Brazil

Technip was awarded by Petrobras a highly technological lump sum contract for the Guara & Lula Nordeste pre-salt field development located in the Santos Basin, offshore Brazil, at a water depth of 2,250 meters. The contract covers the manufacture of 24 kilometers of 6’’ gas injection flexible lines

2 minutes read
  • LinkedIn
  • X
  • Email

Technip was awarded by Petrobras a highly technological lump sum contract for the Guara & Lula Nordeste pre-salt field development located in the Santos Basin, offshore Brazil, at a water depth of 2,250 meters.

The contract covers the manufacture of 24 kilometers of 6’’ gas injection flexible lines rated for 552 bars (7,850 pound-force per square inch) design pressure:

* 2 x 200 meters top risers designed with Technip’s innovative Teta-Clip pressure vault technology,

* 4 x 1,400 meters of intermediate and bottom risers,

* 18 kilometers of flowlines.

The gas injection lines will be used to re-inject produced gas into the reservoir to respect new Brazilian environmental regulation.

Frédéric Delormel, Technip Executive Vice President and COO Subsea , stated: “This very innovative solution developed by our French & Brazilian R&D teams takes Technip further to meet corrosion & fatigue requirements, which increased with pre-salt field developments. Our success in this first pre-salt tender for gas injection flexible risers demonstrates the leading edge position of our Teta-Clip pressure vault technology to meet such high internal pressure and high tension requirements, and comfort us in our investment to build our new flexible plant in Açu, Brazil, which will be capable to manufacture this type of high-end products.”

The pipelines will be manufactured at Technip’s flexible pipe plants and delivered in two batches, the first one in 2012 and the second in the first quarter of 2013.

[mappress] Subsea World News Staff , February 27, 2012; Image: Technip

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1More work with Petrobras increases Brazilian firm's backlog to over $2 billion
  2. 2Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  3. 3Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  4. 4Lamprell tasks IMI with offshore platform and jacket fabrication scope

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free