Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›USA: InterMoor’s Suction Piles for Gulfstar Spar
Fossil Energy

March 2, 2012 · about 14 years ago

USA: InterMoor’s Suction Piles for Gulfstar Spar

Acteon’s InterMoor has been awarded a contract for the design and fabrication of the suction piles for the Williams Gulfstar FPS (Floating Production System) Spar in the Gulf of Mexico. InterMoor will design and fabricate 10 suction piles for the project. All 10 piles are 16 ft in diameter and 97 ft

1 minutes read
  • LinkedIn
  • X
  • Email

Acteon’s InterMoor has been awarded a contract for the design and fabrication of the suction piles for the Williams Gulfstar FPS (Floating Production System) Spar in the Gulf of Mexico.

InterMoor will design and fabricate 10 suction piles for the project. All 10 piles are 16 ft in diameter and 97 ft long and are designed to be used as anchors for the project.

InterMoor has started fabrication of all 10 piles at its new 24-acre Morgan City, La., facility. The piles will be pre-set in 4,300 feet of water to anchor that FPS in block 768 of the Gulf of Mexico’s Mississippi Canyon.

“We take pride in our work and the companies that choose to do business with InterMoor; this project comes on the heels of another major fabrication contract with EMAS,” said Fulton. “The consistency in which we successfully win and complete these contracts validates the quality of our services and speaks volumes about our committed employees.”

The Gulfstar spar will be installed in block 768 of the Gulf of Mexico’s Mississippi Canyon area to produce oil and gas from the Tubular Bells field, which is owned by Hess Corporation (Operator) and Chevron U.S.A. Inc. The Gulfstar spar platform will be located in 4,300 feet of water and designed to process 60,000 barrels of oil per day and 200 MMscf of gas per day.

[mappress] Offshore Energy Today Staff, March 2, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1New gas pay for Chevron in Mediterranean waters
  2. 2DeepOcean to employ recently upgraded subsea vessel offshore Ghana
  3. 3Saipem wins multimillion-dollar rig jobs with Eni in Mediterranean and West Africa
  4. 4Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free