Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Spain: TERCAT Takes Delivery of Four Cranes for Muelle Prat Terminal
Dredging

March 20, 2012 · about 14 years ago

Spain: TERCAT Takes Delivery of Four Cranes for Muelle Prat Terminal

On March 16, TERCAT took delivery of four Super-Post-Panamax quay cranes for its new container terminal at Muelle Prat, making a total of eight such cranes at the facility. TERCAT, a member of the Hutchison Port Holdings Group, received the first four quay cranes for Muelle Prat on 6 March. The cran

1 minutes read
  • LinkedIn
  • X
  • Email

On March 16, TERCAT took delivery of four Super-Post-Panamax quay cranes for its new container terminal at Muelle Prat, making a total of eight such cranes at the facility.

TERCAT, a member of the Hutchison Port Holdings Group, received the first four quay cranes for Muelle Prat on 6 March. The cranes have a height of 42 metres under spreader and weigh approximately 1,700 tonnes. They each have a maximum load capacity of 61 tonnes and an outreach of 22 container rows.

TERCAT has already taken delivery of other terminal equipment for Muelle Prat including 15 Automatic Stacking Cranes (ASC), and 11 Shuttle Carriers, used to transport containers from the quay side to the yard. The ASCs are one-over-five models and span nine container rows. A further 21 ASCs and nine shuttle carriers are on order.

The advanced semi-automatic equipment that will be used at Muelle Prat is expected to increase the efficiency of its operations, especially when servicing mega-vessels.

The terminal is scheduled to be operational in mid-2012. It will have 1,500 metres of quay, a draught of 16.5 metres and a 100 hectare yard.

[mappress]

Dredging Today Staff, March 20, 2012; Image: TERCAT

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1New gas pay for Chevron in Mediterranean waters
  2. 2DeepOcean to employ recently upgraded subsea vessel offshore Ghana
  3. 3Saipem wins multimillion-dollar rig jobs with Eni in Mediterranean and West Africa
  4. 4Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free